Assembling and debugging of AVN2440DS Shield Machine

SU Qing-Gui   

  1. The 1st TBM Construction Branch of the 2nd Engineering Co.| Ltd. of China Railway
    Tunnel Group, Yanjiao 101601, Beijing, China
  • Received:2006-03-08 Revised:2006-04-03 Online:2006-05-25 Published:2009-12-31

Abstract:

The article describes the assembly method of AVN2440DS shield machine on basis of parts and elements, as well as the technical details of the assembly to which special attention should be paid. Furthermore, the article presents the debugging of the hydraulic system, electric system, compressed air system, circulation water system and grease injection system, which is conducted on the ground surface. The article places its emphasis on the presentation of the debugging of the thrust cyclinders.