Tunnel Construction ›› 2009, Vol. 29 ›› Issue (2): 157-161.DOI: A

• wenzhang • Previous Articles     Next Articles

Discussion on New Tunnel Excavation Method Used in Soft Ground

DONG Shulian1,  HUANG Mingqi1,2, FENG Chuandong1   

  1. 1. Xiamen Xiang’an Subsea Tunnel Project, China Railway 22th Bureau Group2. College of Civil Engineering and Architecture, Shandong University of Science
    and Technology
  • Received:2008-12-22 Revised:2009-02-02 Online:2009-04-20 Published:2009-11-17

Abstract:

Under the guiding of New Austrian Tunneling Method, there are two basic construction methods, i.e., CRD construction method and both side drift method, for large crosssection tunnels in weak strata. The excessive settlement of the primary support is a serious problem in the construction of large crosssection tunnels, which causes the projection of the primary support structure into the tunnel clearance and thus the replacement of the primary support structure.  Because of the excessive settlement, serious collapse accidents occur one after another. For the moment, all the traditional construction methods can not effectively solve the problem. A new tunnel excavation method, i.e., bottom heading method, is recommended, which can not only completely solve the problem of primary support settlement and convergence, but also can guarantee the construction safety, improve the construction speed and construction quality and reduce the construction cost.

CLC Number: