Tunnel Construction ›› 2009, Vol. 29 ›› Issue (3): 310-312.DOI: A
• wenzhang • Previous Articles Next Articles
CAO Hongbin1, WEI Xiuyan2
Received:
Revised:
Online:
Published:
Abstract:
At present, the requirements for safety in tunnel construction are strict. Due to the fact that advance geological forecast takes a long time, geological forecast is always neglected in the event of limited construction period and smooth performance of a project. In order to ensure the safety in tunnel construction, the authors improve the advance geological forecast methods based on practices in construction. After the optimization, the time required by advance geological forecast is minimized and the efficiency of advance geological forecast is raised.
CLC Number:
 
U 452.1
CAO Hongbin, WEI Xiuyan. Study on Improving Efficiency of Advance Geological Forecast of Tunnel[J]. Tunnel Construction, 2009, 29(3): 310-312.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2009/V29/I3/310