Tunnel Construction ›› 2009, Vol. 29 ›› Issue (5): 548-551,557.DOI: B
• wenzhang • Previous Articles Next Articles
YANG Ji-Yan
Received:
Revised:
Online:
Published:
Abstract:
As one of the crucial procedures of shield boring, the arriving of shield machines with superlarge diameters is complicated in technology and has great risks. Taking the arriving of the shield machine for Nanjing Yangtze River Tunnel as an example, the author presents the comprehensive construction measures, including the portal section reinforcement by mixing piles, dewatering, freezing and water & soil filling in shield arriving shaft. The above measures guarantee the safe arriving of the superlarge diameter slurry shield under the condition of shallow cover and highly permeable ground. This paper can provide reference for similar projects in the future.
Key words: shield machine with superlarge diameter, arriving, construction technology
CLC Number:
U 455
YANG Ji-Yan. Case Study on Arriving Construction Technology of Slurry Shield Machine with Superlarge Diameter[J]. Tunnel Construction, 2009, 29(5): 548-551,557.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I5/548
Environmental Protection Techniques for New Badaling Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area
Key Construction Technology of Large Crosssection Horseshoeshaped Shield: a Case Study on Baicheng Tunnel on Menghua Railway