Fullface Advance Grouting for Water Sealing and Reinforcement of Karst Section of Xiangshan Tunnel

 HAN Zhi-Huai   

  1. China Railway Tunnel Survey &|Design Institute Co., Ltd., Tianjin 300131, China
  • Received:2009-07-13 Revised:2009-10-10 Online:2009-11-07 Published:2009-12-08

Abstract:

The engineering geology and hydrogeology of the karst section of Xiangshan tunnel on LongyanXiamen railway is presented. The fullface advance grouting technology for karst area, including grouting parameters, grouting materials, grouting procedure, grouting technique, grouting equipment and grouting effect assessment, are described, with the grouting in YDK24+114~+144 section of Xiangshan tunnel as an example. This paper can provide reference for similar projects in the future.

Key words: karst tunnel, fullface grouting, grouting material, reinforcement technology, water sealing