ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (5): 563-568.DOI: B
• wenzhang • Previous Articles Next Articles
CHEN Xiu-Wen
Received:
Revised:
Online:
Published:
Abstract:
Railway tunnels are always located in mountains. As a result of uneven topography, dense vegetations and complex terrain, it is difficult to carry out the survey works. For long tunnels, GPS survey is the favorite method. Due to the limit of the topography and terrain conditions, however, the selection of the GPS control points and the arrangement of the control network can not meet the requirements of the corresponding specifications. Based on the application of GPS control survey in Huanggou tunnel on DalianMudanjiang railway in Northeast China, the author presents the complete GPS survey process for long tunnels in complex geographical conditions, including GPS control network establishment, survey scheme determination, survey execution, survey data processing, survey result verification and analysis and survey result application. The above technologies guarantee the highaccuracy breakthrough of the tunnel. The paper can provide reference for similar projects in the future.
Key words: long tunnel, GPS control survey, data processing technology
CLC Number:
U452.1
CHEN Xiu-Wen. Technology of GPS Plane Control Survey outside Long |Railway Tunnels[J]. Tunnel Construction, 2009, 29(5): 563-568.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I5/563
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern Xinjiang
Full-Scale Test on Internal and External Pressure Wave Characteristics of High-Speed Trains in Long, Steep Tunnels and Tunnel Group Environments
Evolution of Pore Pressure Around Tunnel Face and Influence of Longitudinal Value of ThreeDimensional Seepage Calculation on It During Construction of a Water Conveyance Tunnel With Rich Water
Synchronous CastinPlace Construction Technology and Equipment Development for TBM Tunnel Invert Arch
Calculation Method and Application of Initial InSitu Stress Interpolation in Longitudinal Section of DeepBuried Long Tunnel
Smoke Exhaust Structure Type of Emergency Rescue Station of Extralong Tunnel at HighAltitude Plateau Areas
Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines
Physiological Load and Driving Safety for Drivers at Entrance and Exit of an ExtraLong Tunnel