ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (6): 608-611.DOI: A
• wenzhang • Previous Articles Next Articles
WANG Zhi-Gang
Received:
Revised:
Online:
Published:
Abstract:
Taking the construction of the smallspaced group tunnels of Xuanwumen Station on No. 4 Line of Beijing Metro as an example, the author optimizes the construction methods, excavation sequences, distances among excavation faces of the pilot tunnels and bench lengths by orthogonal tests and numerical simulations. The author also analyzes the ground surface settlement caused by construction of group tunnels, as well as the mutual influence among the group tunnels. Reasonable construction scheme is determined on basis of the analysis and study results. The paper can provide reference for future studies.
Key words: small spacing  , group tunnels construction scheme optimization  , orthogonal test  , numerical simulation  , ground surface settlement
CLC Number:
U 455.4
WANG Zhi-Gang. Optimization of Construction Scheme of Group Tunnels with Small Spacing[J]. Tunnel Construction, 2009, 29(6): 608-611.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2009/V29/I6/608