Tunnel Construction ›› 2009, Vol. 29 ›› Issue (6): 689-693.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Technology to Cope with Large Scale Deepburied
Fillingtype Karst Caves during Tunnel Construction

DAI Wei, LI He-Yong   

  1. 1. The 3rd Branch of China Railway Tunnel Stock Co., Ltd., Wanyuan 636363, Sichuan, China;
    2. Project Management Department of AnkangLiangjiaba Section on XiangfanChongqing Railway,
    China Railway Tunnel Group, Ankang 425000, Shaanxi, China
  • Received:2009-05-13 Revised:2009-11-23 Online:2009-12-20 Published:2010-01-06

Abstract:

Taking the treatment of the karst caves encountered during the construction of new Dabashan tunnel as an example, the authors briefly present the treatment scheme for karst caves and the reinforcement method for pile tundations. The authors make further discussion on the treatment technology for large scale fillingtype karst caves in terms of advance reinforcement by large pipe roof, radial grouting through small pipes, steel pipe pile and jet grouting pile. This paper can provide reference for similar projects in the future.

Key words: tunnel  , fillingtype karst cave  , large pipe roof  , CRD method steel pipe pile  , jet grouting pile