A Study on the Face Stability of the Fine Sand Layer Bored by S-366 Shield Machine at Chengdu Metro

SONG Xiu-Yuan1, DIAO Xu-Wei2   

  1. 1.The 2nd Engineering Co.,Ltd.of China Railway 13th Bureau Group,Shenzhen 518000,Guangdong,China;
    2.Jilin Architectural and Civil Engineering Institute,Changchun 130021,China
  • Received:2009-03-18 Revised:2009-04-01 Online:2009-04-15 Published:2010-04-06

Abstract:

Based on the practice of shield construction in Bid 2 of Chengdu Metro Line 1, a study is made on the excavation face balance and stability of fine sand layer bored by S-366 shield machine. An exemplary calculation of the establishment of two balance modes of EPB shield machine crossing through single stratum is made and a discussion is made to the 2 balance modes.

Key words: EPB shield machine, fine sand layer, failure mechanism, balance mode