ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 184-188.DOI: B
• wenzhang • Previous Articles Next Articles
CHAI Xilin
Received:
Revised:
Online:
Published:
Abstract:
Taking two tunnels with small clear spacing located on Liu'anQianshan expressway and Yong'anWuping expressway as examples, the author compares the tunneling method and rock pillar reinforcement measures of the two tunnels in different geology conditions, based on the practice of construction of tunnels with small clear spacing in China. In addition, the author recommends the reasonable construction methods for tunnels with small clear spacing in this paper, which can provide reference for similar projects in the future.
Key words: tunnel with , small clear spacing excavation method rock pillar
CLC Number:
U 455
CHAI Xilin. Construction Schemes of Tunnels with Small Clear Spacing Located in Different Geology Conditions[J]. Tunnel Construction, 2009, 29(增刊2): 184-188.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊2/184