ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2010, Vol. 30 ›› Issue (3): 331-335.
• wenzhang • Previous Articles Next Articles
WANG Jian-Xin1, CHEN Shou-Gen2, WANG Jing-Hua2
Received:
Revised:
Online:
Published:
Abstract:
The various utility lines in urban areas, especially the gap pipelines, have great influence on the construction safety and construction schedule of the Metro tunnels. The measures taken to protect the utility lines during the shallowcovered mining construction of ShangmeilinMinle section of phase II project of line 4 of Shenzhen Metro are presented, with the focus being placed on the advance large pipe roof, soletanche grouting and soil releasing. In the end, the settlement of the utility lines is effectively controlled, the safety of the utility lines is ensured and the successful construction of the project is guaranteed.
Key words: tunnel under shallow cover, protection technology, gas pipeline, ground surface settlement, advance large pipe roof, soletanche grouting, soil releasing
WANG Jian-Xin, CHEN Shou-Gen, WANG Jing-Hua. Gas Pipeline Protection Technology in Phase Ⅱ Project of Line 4 of Shenzhen Metro[J]. Tunnel Construction, 2010, 30(3): 331-335.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I3/331