| [1] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [2] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [3] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [4] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [5] |
LIU Yaoru, HOU Shaokang, WEI Fang, YU Jialin, HE Wei, CHENG Li, JIAO Pengcheng.
State of the Art and
Development Trends in Intelligent Construction of Tunnel Boring Machines
[J]. Tunnel Construction, 2025, 45(1): 21-45.
|
| [6] |
ZHENG Jiayan, LAN Pengbo, LIU Haijing, LU Zhan, YANG Lijuan, CHEN Dingjia.
Analytical Solution of Bending Moment and Section Parameters of Square Arched Corrugated Steel Utility Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 167-178.
|
| [7] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [8] |
YANG Minghui, SONG Muyuan, YAO Gaozhan, CHEN Wei, ZUO Guolian, CAI Zhiyuan.
Research Progress and Prospects for Machine Learning in Predicting Surface Settlement Induced by Shield Tunneling
[J]. Tunnel Construction, 2024, 44(11): 2119-2132.
|
| [9] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
| [10] |
CHU Kai, HE Weiguo, YU Yong.
Route Scheme of Pearl River Estuary Tunnel Project of ShenzhenJiangmen Railway
[J]. Tunnel Construction, 2022, 42(9): 1597-1604.
|
| [11] |
DAI Xin, HE Weiguo, WANG Dongwei, LYU Qingsong, YU Yong.
Drainage Design of a DeepBuried
Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
[J]. Tunnel Construction, 2022, 42(4): 695-702.
|
| [12] |
LIU Guoqiang, LIU Bin, ZHANG Qingming, ZHANG Ruilin, HUANG Feng, TONG Xiaodong.
Parameter Optimization of Smooth Blast in Karst Tunnel
and Its Application
[J]. Tunnel Construction, 2021, 41(S2): 50-57.
|
| [13] |
WU Huiming, CHANG Jiaqi, LI Gang, ZHANG Dongming, HUANG Hongwei.
Prediction of Driving Posture and Optimization of Construction
Parameters for
Shield Based on Support Vector Machine
[J]. Tunnel Construction, 2021, 41(S1): 11-.
|
| [14] |
LIANG Yongfeng, WU Bo, WANG Jinjin, LI Chenghu, SUO Xiao, ZHANG Ke.
Optimization of Recharge Parameters for Foundation Pit
Engineering Based on Orthogonal Test and Fuzzy Analytical Hierarchy ProcessValue Engineering Method
[J]. Tunnel Construction, 2021, 41(9): 1492-1501.
|
| [15] |
SUN Feixiang, PENG Zhengyong, ZHOU Jianjun, YANG Zhenxing, ZHANG Jichao, TANG Zongxiong.
Study on Breakthrough Modes in Docking Section between
Shield and Mined Sections Considering Rock Mass Classification
[J]. Tunnel Construction, 2021, 41(8): 1336-.
|