| [1] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [2] |
WU Fei, LIU Baodong, ZHANG Yu, ZHANG Jilei, KONG Xiao, WU Yibin, WANG Zhihong.
Experimental Study and Theoretical Analysis on Flexural Performance of Inverted Reinforced Corrugated Steel Components
[J]. Tunnel Construction, 2026, 46(1): 113-123.
|
| [3] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [4] |
REN Siyong.
Migration Imaging of Ground
Penetrating Radar Using an Adaptive Attenuation Compensation Model and Its Applications
[J]. Tunnel Construction, 2024, 44(8): 1599-1608.
|
| [5] |
XUE Jiangsong, YIN Jiankun, CHEN Hongming.
Design and Application of Construction Equipment for
Entire Process of CastinPlace
Inverted Arch in Central Yunan WaterDiversion Project in China
[J]. Tunnel Construction, 2024, 44(3): 605-616.
|
| [6] |
XU Pengzu, YANG Yandong, XU Haifeng, LIU Wanlin, WANG Tianyi.
Synchronous CastinPlace
Construction Technology and Equipment Development for
TBM Tunnel Invert Arch
[J]. Tunnel Construction, 2023, 43(S1): 480-486.
|
| [7] |
XU Huairen.
Causes for Floor Heave of HighSpeed
Railway Tunnels in Argillaceous Limestone Strata
[J]. Tunnel Construction, 2023, 43(6): 1075-1088.
|
| [8] |
CHEN Shihao, DAI Qinghua, CHEN Peishuai, YUAN Qing, XIONG Qihuan, YANG Zhao.
Technology and Application of Temporary Invert With
Detachable Components in Tunnels
[J]. Tunnel Construction, 2023, 43(10): 1779-1787.
|
| [9] |
ZHANG Mingju, HAN Yixuan, LI Pengfei, GUO Caixia, WU Aiguo.
Field Experimental Study on SteelCorrugated
PlateMold Bag Concrete Supporting
Structure of Circular Shaft#br#
[J]. Tunnel Construction, 2022, 42(7): 1146-1155.
|
| [10] |
QING Weichen, ZHONG Changgui, ZENG Hongfei.
Discussion on Inverted Arch and Its Filling by
Separate Pouring or Integral Pouring in Railway
Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 63-.
|
| [11] |
XIA Hai, XU Guangyang, FU Jinyang, XIAO Ouhui, ZHANG Yuehui, ZHAO Ningning, YANG Junsheng.
Study on Technology of Precast Temporary Inverted Arch
in Loess Tunnel with ThreeBench Method and Its
Application
[J]. Tunnel Construction, 2021, 41(S1): 431-.
|
| [12] |
LI Weichao.
Architectural Design Scheme of Inverted-Hall
Metro Stations
[J]. Tunnel Construction, 2021, 41(12): 2133-2139.
|
| [13] |
SU Hui.
Key Construction Technologies for Wanrong Tunnel of Menghua
Railway Crossing SiltyFine Sand Stratum
[J]. Tunnel Construction, 2020, 40(S2): 225-232.
|
| [14] |
WEI Li, ZHOU Xitao.
Analysis and Countermeasures for Inverted Arch
Diseases in High Geostress Section of Railway Tunnel
in Plateau and Cold Region: a Case Study on Muzhailing
Tunnel of LanzhouChongqing Railway
[J]. Tunnel Construction, 2020, 40(S2): 249-255.
|
| [15] |
WU Min, HUANG Zhi.
Construction Quality Control Technology of Inverted
Arch of Singletube Doubletrack
Railway Tunnel
[J]. Tunnel Construction, 2020, 40(S1): 278-287.
|