Tunnel Construction ›› 2011, Vol. 31 ›› Issue (1): 110-113.

• wenzhang • Previous Articles     Next Articles

Construction and Control of Level Parallel Large
 Diameter Pipe Jacking Crossing Embankment

 GONG  Yun-Jiang1,   Guo-Wei-Feng2,   Zhang-Zhong-Hua2   

  1. 1. North China Municipal Engineering Design and Research Institute, Tianjin 300074, China;
    2. Construction Headquarters of Qige Sewage Treatment Project, Hangzhou 310005, China
  • Received:2010-06-08 Revised:2010-07-06 Online:2011-02-20 Published:2011-03-11

Abstract:

The construction technology for level parallel longdistance largediameter pipe jacking under complex geotechnical conditions are descried in detail after optimization analysis of the construction scheme, with a level parallel pipe jacking project as an example. The monitoring resultsof the deformation of the stratum caused by the pipe jacking construction are analyzed. The characteristics of the stratum disturbance during the crossing process is provided.Some countermeasures to control the deformation are recommended and the construction safety is quaranteed.

Key words: large diameter, level parallel pipejacking, crossing embankment, embankment deformation monitoring, embankment deformation control