[1] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[2] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[3] |
LIU Feixiang, YU Yang.
TBM Technologies in Bad Geology of a Tunnel Project
[J]. Tunnel Construction, 2019, 39(9): 1515-1522.
|
[4] |
WANG Yuanchao, DU Leigong, WANG Yingchun, ZHANG Yuelin.
Key Technology of Advance Geological Prediction and Pretreatment of TBM Construction in Deepburied Tunnel
[J]. Tunnel Construction, 2019, 39(8): 1350-1356.
|
[5] |
LIU Jiandong, GUO Jingbo, WANG Xudong.
Recognition Methods for Boulder Geology Based on Shield Tunneling Parameters
[J]. Tunnel Construction, 2019, 39(7): 1132-1140.
|
[6] |
YANG Yandong, CHEN Kui, ZHANG Xiao.
Development and Application of Key Technologies for TBM Used in Complex Geological Conditions
[J]. Tunnel Construction, 2019, 39(6): 1052-1058.
|
[7] |
ZHANG Chongmin, ZHANG Fengkai, LI Yao.
Study of Full Waveform Inversion of Advance Tunnel Geological Prediction by Ground Penetrating Radar
[J]. Tunnel Construction, 2019, 39(1): 102-109.
|
[8] |
GAO Jun, ZHAN Yueyue, LIU Kai, LI Bo.
Modification Analysis and Threedimensional Modeling of Bad Geology of ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2018, 38(S2): 16-24.
|
[9] |
XU Hui, ZHOU Leisheng, LIU Yinfeng, ZHU Shichao, RAN Lingqiang.
Tunnel 3D Reconstruction Technology and Application ResearchBased on kinect Sensor
[J]. Tunnel Construction, 2018, 38(S2): 202-208.
|
[10] |
WANG Yanjun, QI Mengxue.
Prospects of Key Technologies of Rock Tunnel Boring Machine
[J]. Tunnel Construction, 2018, 38(9): 1428-1434.
|
[11] |
LIU Wei, WU Chaogang, ZHANG Rui, ZHOU Feipeng.
Analysis of Alteration of Surrounding Rock Classification of Funing Tunnel on YunGui Railway
[J]. Tunnel Construction, 2018, 38(6): 895-900.
|
[12] |
QI Mengxue.
Discussion on Construction Technology and Management of TBM Boring in Extremelybad Geological Conditions
[J]. Tunnel Construction, 2018, 38(12): 2013-2018.
|
[13] |
CHEN Jian.
Study of Cutterhead and Cutting Tool Selection and Cutting Tool Replacement of Largediameter Shield under Atmospheric Condition
[J]. Tunnel Construction, 2018, 38(1): 110-117.
|
[14] |
SI Yudi.
Study of Adaptability of Doubleshield TBM to Qingdao Metro
[J]. Tunnel Construction, 2017, 37(S1): 212-218.
|
[15] |
HE Xiaoyong, QI Jihong, XU Mo, ZHANG Qiang, ZHANG Shishu, WANG Nengfeng, WEI Bowen.
Study of Catchment Area of Water Inrush Volume Forecast of Tunnel in Complex Geological Conditions
[J]. Tunnel Construction, 2017, 37(1): 56-61.
|