[1] |
LI Fengyuan, ZENG Chuigang.
Development Status and Trend of Intelligent
Manufacturing Operation and Maintenance for Full-Face Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(S1): 6-13.
|
[2] |
ZHOU Jianjun, LI Shuaiyuan, JIANG Yihui, YANG Yandong, CHENG Yonglong.
Force Analysis and Application of Main Drive Bearing
of Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(S1): 522-529.
|
[3] |
XING Hai, XIE Xingfei, GONG Qiuming, HUANG Liu.
Service Life Analysis of Disc Cutter Based on
Equivalent Replacement Times of Disc Cutter of Tunnel Boring
Machine
[J]. Tunnel Construction, 2023, 43(S1): 535-543.
|
[4] |
YOU Jinhu, XIE Tao, LIU Yongsheng, PAN Yue, YIN Long.
Bearing Analysis of Tunnel Surrounding Rocks for
Tunnel Boring Machine Gripper and Treatments of Unfavorable Geology
[J]. Tunnel Construction, 2023, 43(S1): 473-479.
|
[5] |
CHEN Yu.
Construction Technology and Improvement of
"Coring + Splitting" NonExplosive Method for Hard Rock Water Releasing Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 443-450.
|
[6] |
TAN Lei, JIANG Xiaoyi, HU Xiongwu, XU Hu.
Simulation and Application of Wenner AMN & MNB
Joint Inversion Imaging in Concealed Soft and Hard Rock Contact
Zone
[J]. Tunnel Construction, 2023, 43(9): 1501-1510.
|
[7] |
WANG Pengxing, HE Fei, NING Xiangke, SENG Xiongfei.
Research and Application of Key Technologies of Large
Diameter Tunnel Boring Machine with Large Slope and UltraSmall
Turning Radius
[J]. Tunnel Construction, 2023, 43(9): 1614-1622.
|
[8] |
QI Zhichong, LYU Dan, HE Fei, XU Guangyi.
Carrying and Application of Water Jet CutterAssisted
Rock Breaking Technology
[J]. Tunnel Construction, 2023, 43(8): 1404-1412.
|
[9] |
HE Enguang, REN Zhiqiang, ZHOU Peng, YE Long.
Design and Simulation Analysis of Cutting Mechanism of
QuasiRectangular FullFace
Tunnel Boring Machines for Coal Mine Roadway
[J]. Tunnel Construction, 2023, 43(5): 865-873.
|
[10] |
ZHENG Yongguang, ZHANG Na, LIU Yangyang, SUN Chunhuan, JING Liujie, LI Pengyu.
Prediction Model of Tunnel Boring Machine′s
Tunneling Parameters Based on Multimodal Control Strategy
[J]. Tunnel Construction, 2023, 43(4): 583-591.
|
[11] |
YANG Yandong.
Stability Identification Methods for Tunnel
Surrounding Rock Based on Tunneling Parameters
[J]. Tunnel Construction, 2023, 43(3): 423-428.
|
[12] |
REN Yingying, HU Xinpeng, XIA Zhanhui, ZHOU Zhenjian.
DataDriven Collaborative DecisionMaking Technology for Manufacturing
and Operation Maintenance of Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(3): 496-504.
|
[13] |
YANG Zhao, TANG Dongyun, LIU Pengfei, HE Yuan, LI Zifeng, LI Rui, XU Chao.
Key Construction Technologies and Difficulties of
SuperLargeDiameter Shield Tunnel Under Urban Lake: a Case Study of Nanhu
Section
of Lianghu Tunnel in Wuhan, China
[J]. Tunnel Construction, 2023, 43(2): 296-304.
|
[14] |
LIU Jiao, JIA Lianhui, FAN Lei, DONG Yanping, YUAN Zheng.
Key Technologies of Excavation Blind Area Treatment
for NonCircular Tunnel
Boring Machine in Composite Strata
[J]. Tunnel Construction, 2023, 43(2): 345-353.
|
[15] |
LI Cheng, ZHAO Yicong, QIU Meng, CHEN Qiaoqiao.
Influencing Factors of Efficiency and Energy
Consumption in Abrasive Water Jet Repetitive Cutting of Granite
[J]. Tunnel Construction, 2023, 43(12): 2018-2025.
|