| [1] |
HAN Sheng.
Prefabrication and Installation Technology of
Permanent and Temporary Integrated Prefabricated Diaphragm Wall: A Case of Xichong Station of Shenzhen
Metro
Line 8 Phase Ⅲ
[J]. Tunnel Construction, 2025, 45(S1): 260-269.
|
| [2] |
HUANG Jiahuan, RAO Wei, QIU Tong, CHEN Xiangsheng, CHEN Wuxiong YANG Li, CHEN Kunyang, HE Qiufeng, ZHENG Zhenji, WU Beiyu, LI Aidong, LU Linhai.
Experimental Study on Mechanical Properties of Longitudinal Joints in Prefabricated Two-Wall-in-One Diaphragm Walls
[J]. Tunnel Construction, 2025, 45(3): 556-566.
|
| [3] |
HAN Sheng.
Experimental Study on
Construction of a Permanent and Temporary Integrated Prefabricated Underground Diaphragm Wall Model
[J]. Tunnel Construction, 2024, 44(S2): 445-451.
|
| [4] |
CHAO Hui, TAN Yong, LIU Tianren.
MesoMechanism of Ground Collapse Induced
by Leaking of Underground
Diaphragm Wall in WaterRich Sandy Strata
[J]. Tunnel Construction, 2023, 43(7): 1180-1189.
|
| [5] |
HUANG Yanjun, YUAN Shan, WANG Cong, CHEN Baoguo, ZHANG Yanlin.
Theoretical Analysis of Displacement and Axial Force
in Support Structures During Dynamic Adjustment of
Internal Support Systems in Foundation Pits
[J]. Tunnel Construction, 2023, 43(5): 761-769.
|
| [6] |
LI Fangbao, LONG Xi′an.
Deformation Characteristics and Applicability Analysis
of Support Structure for Metro Deep Foundation Pit in Soft
Soil in Foshan Area, China
[J]. Tunnel Construction, 2022, 42(S2): 294-304.
|
| [7] |
ZHANG Yuqi, QIU Yunjun, GUO Jiantao, WANG Qiangxun, SU Shouyi, RAO Bangzheng.
Design and Application of PileStyle
Reinforcement for Underground Diaphragm Wall under
Narrow Site Condition
[J]. Tunnel Construction, 2022, 42(S1): 389-395.
|
| [8] |
NIU Ruoxin, DONG Haizhou.
Experimental and Numerical Simulation of PumpingTracing
Method for Detecting Leakage in Underground Diaphragm
Wall
[J]. Tunnel Construction, 2022, 42(11): 1889-1897.
|
| [9] |
WANG Jin, SUN Chao, FU Qiao, LI Junyin, JIA Lixiang, ZHANG Wenxuan.
Deformation Monitoring Technology of Underground
Diaphragm Wall Based on Brillouin Optical Frequency Domain Analysis
[J]. Tunnel Construction, 2021, 41(S2): 558-564.
|
| [10] |
CHEN Jinming, WU Qiang, YANG Xinying, SHU Kaibo, YU Guohua.
Deformation Monitoring and Analysis of a New Composite
Retaining Structure
for Deep Foundation Pit of a Station Adjacent to a River
[J]. Tunnel Construction, 2021, 41(S1): 89-.
|
| [11] |
ZHUANG Qianwei, ZHANG Fubing, ZHANG Chi, ZHU Longhai.
Impact of Tool Taper and Arc Length on Cutting
Efficiency of Pick
Cutter on Concrete Diaphragm Wall
[J]. Tunnel Construction, 2021, 41(8): 1307-.
|
| [12] |
SU Liyong, LU Qingquan, ZHANG Zhiwei, XU Yang, REN Yuhong, ZHOU Yi.
Assembled Technology of Top Air Duct of a Metro
Station:a Case Study on Phase 1 Project of Beijing Metro Line No. 19
[J]. Tunnel Construction, 2021, 41(5): 814-821.
|
| [13] |
RAN Haijun, ZHANG Wenxin, NIU Zhanwei, PENG Qi, XIANG Yixiong, LI Yuntao, GAO Guangyi.
Application and Analysis of Singlelayer
Fiberglass Mesh in Reception of Super large Diameter Shield: a Case
Study on Shield
Tunnel of Su′ai Channel
[J]. Tunnel Construction, 2020, 40(S2): 233-240.
|
| [14] |
WANG Shejiang, ZHAO Lifeng, HUANG Qiming, SHEN Kailun, YANG Junsheng, SUN Guangchen.
Study on Construction Method of Diaphragm Wall of
Foundation Pit of Metro Station Crossing Underneath Operation Power
Cable of
Existing
Rail Transit Based on Insitu Protection
[J]. Tunnel Construction, 2020, 40(S1): 337-342.
|
| [15] |
CHEN Xiaofeng, WANG Xingping, GUO Chun, HAN Yu.
Study of New Intermediate Diaphragm Wall in Ventilation Parallel Heading of Zhegushan Extra-long Highway Tunnel
[J]. Tunnel Construction, 2020, 40(5): 702-710.
|