[1] |
LIU Xingen, WANG Bozhi, LIU Xiaodi.
Track Deviation Correction Method of Shield Based on
Space S-Curves
[J]. Tunnel Construction, 2023, 43(S1): 457-463.
|
[2] |
LI Gongyi.
Fault Analysis and Countermeasures for Screw Conveyor
of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section
[J]. Tunnel Construction, 2022, 42(S2): 502-507.
|
[3] |
LIU Jiajun, YANG Guang, WANG Junjie, HAN Weifeng, CAI Jun, ZHAO Xiangbo.
Development and Application of Intelligent Grease
Monitoring Device for Shield Based on Phase Laser Sensor
[J]. Tunnel Construction, 2022, 42(S2): 525-532.
|
[4] |
CHEN Qiankun.
EnlargingDiameter Modification of
Composite Cutterhead of Shield Based on ANSYS
[J]. Tunnel Construction, 2022, 42(S2): 533-540.
|
[5] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|
[6] |
LI Jianbin.
Current Status, Problems and Prospects of Research,
Design, and Manufacturing of Boring Machine in China
[J]. Tunnel Construction, 2021, 41(6): 877-896.
|
[7] |
HUANG Zhonghui, CHEN Fan, MENG Qingjun, LIU Chuankun, CHENG Fan, WANG Shimin, YAO Chaofan.
Analysis of Risks and Targeted Design of Dualmode
Shield in Composited Strata
[J]. Tunnel Construction, 2020, 40(S2): 297-305.
|
[8] |
CHEN Yanan, CHEN Liangwu, ZHAO Lei, MA Lin.
Detection and Cause Analysis of Main Drive Seal
Failure of Shield
Machine
[J]. Tunnel Construction, 2020, 40(S1): 419-422.
|
[9] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[10] |
QIN Dongchen, ZHOU Peng.
Analysis of Sunk Volume in Shield Construction Process Based on Su AI Channel Project
[J]. Tunnel Construction, 2018, 38(S2): 7-15.
|
[11] |
XU Zan, XU Zhengshuai, CHEN Xianzhi, XU Xing, GU Zhanghe.
Research on Construction Support Scheme of Superstructure of Opencut Subway Station under the Condition of Shield Machine Driving through a Station
[J]. Tunnel Construction, 2018, 38(S2): 303-309.
|
[12] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[13] |
ZHENG Yongguang, XUE Guangji, CHEN Jinbo, PANG Wenzhuo.
Development, Application and Prospect of Technology of Specialshaped Boring Machine in China
[J]. Tunnel Construction, 2018, 38(6): 1066-1078.
|
[14] |
YANG Yuan, WANG Chunsong.
Driving Control Technology for Active Articulated Shield Machine in Moderately Weathered Mudstone in Continuous Small Radius Curve
[J]. Tunnel Construction, 2017, 37(S1): 189-193.
|
[15] |
LI Dongli, SUN Zhihong, REN Dezhi, SUN Wei.
Study of Application of Eddycurrent Sensor to Disccutter Wear Monitoring System of Shield Machines
[J]. Tunnel Construction, 2016, 36(6): 766-770.
|