Rapid Construction Technologies for Subway Station with Shallow  Overburden: Case Study on Chongqing Rail Transit

FAN Yuhui   

  1. (The 4th Engineering Co., Ltd. of China Railway Tunnel Group, Chongqing 401147, China)
  • Received:2011-08-02 Revised:2011-09-30 Online:2011-11-20 Published:2011-12-29

Abstract: The advantages and disadvantages of construction technologies are analyzed with the construction of Gaoyikou station on Line 6 of Chongqing rail transit as an example. The paper can provide reference for the construction scheme selection of the similar projects in the future.

Key words: Chongqing rail transit, shallowcover and mined tunnel, subway station, rapid construction