ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2011, Vol. 31 ›› Issue (S2): 57-61.

• wenzhang • Previous Articles     Next Articles

Common Issues of Launching and Arriving for Earth Pressure Balance Shield Tunneling in Waterrich and Silty Strata

MENG Haifeng, LIU Jiangtao, LI Shijun   

  1. (The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2011-08-11 Revised:2011-10-05 Online:2011-11-20 Published:2011-12-29

Abstract: Ground reinforcement near shield launching and arriving shaft is used to guarantee the safety of the shield tunneling. Some issues and their treatments of launching and arriving for earth pressure balance shield tunneling in waterrich and silty strata of No.7 bid section on line 1 of Wuxi Metro are presented. The paper can provide reference for earth pressure balance shield tunneling in waterrich and silty strata.

Key words: shield launching, arriving, waterrich and silty strata, reinforcement