| [1] |
TANG Langzhou, WU Lei, ZHENG Li, YU Li, CUI Zhen.
Theoretical Calculation Method for Seismic Analysis of Double-Arch Tunnels Under Near-Fault Ground Motions
[J]. Tunnel Construction, 2026, 46(9): 1916-1933.
|
| [2] |
CHEN Jian, SU Xiuting, YOU Shaoqiang, ZANG Guobao.
Key Technological Innovations and Practices in Construction of Extra-Long Underwater Highway Shield Tunnels: A Case Study of Haitai Yangtze River Tunnel
[J]. Tunnel Construction, 2026, 46(9): 2046-2065.
|
| [3] |
QIN Shaojie, WANG Xiao, ZHOU Junfeng, LUO Song, ZHENG Lining, FANG Yong.
Volume Measurement of Earth Pressure Balance Shield Muck Based on Three-Dimensional Point Cloud Scanning of a Muck Box
[J]. Tunnel Construction, 2026, 46(3): 518-530.
|
| [4] |
GAO Wenliang, WU Hao, YAN Yang, ZHANG Lin, HU Jianli.
Sealing Performance Test and Numerical Calculation of
Shield Tail Under Ultra-High
Water Pressure
[J]. Tunnel Construction, 2025, 45(S1): 61-70.
|
| [5] |
CHEN Junwei.
Stress Response of Shield Tunnel Segments Based on
Model Test and Numerical
Simulation
[J]. Tunnel Construction, 2025, 45(S1): 80-87.
|
| [6] |
HU Shixin, ZHANG Xiaowei, MENG Xin, XUE Peng, XIE Jingchao, LIU Jiaping.
Coupled Evaluation and Application of Green and Low-Carbon
Urban Rail Transit
[J]. Tunnel Construction, 2025, 45(S1): 146-157.
|
| [7] |
XIA Runhe, SHEN Qi, OUYANG Guowei, MA Chen, LI Yiming.
Green Ecological and Environmental Protection
Technologies and Management Practices During Construction Period
of Long Tunnels
[J]. Tunnel Construction, 2025, 45(S1): 249-259.
|
| [8] |
LI Peng, WANG Quansheng, YU Changyi, FU Zeng.
Construction Technology of Metro Stations Using Triple-Circular Shield
[J]. Tunnel Construction, 2025, 45(9): 1756-1767.
|
| [9] |
JIANG Xuepeng, GUO Yuanjun, ZHANG Xiaoning, GUAN Honghao.
Installation Position of Ventilation Relay Duct in
Long-Distance Tunnel: A
Case Study on Hefei-Wuhan High-Speed
Railway Tunnel
[J]. Tunnel Construction, 2025, 45(5): 955-963.
|
| [10] |
WANG Chen, ZHOU Mingke, ZHANG Bo, XU Youjun.
Development and Application of Automated Calculation Platform for Urban Rail Transit Underground Structures
[J]. Tunnel Construction, 2025, 45(10): 1926-1934.
|
| [11] |
LIU Jianyou, FANG Xu, FANG Qian, WANG Jun.
Deformation and Failure Mechanism of Shallow Inclined-Layered Surrounding Rock Tunnel and Calculation Method of Geological Asymmetrically-Pressurized
Load
[J]. Tunnel Construction, 2024, 44(S2): 101-107.
|
| [12] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
| [13] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [14] |
DU Quan, DU Yingchun, YANG Rui, WEI Kang, WAN Youcai, MEI Yuangui.
Full-Scale Test on Internal and External Pressure Wave Characteristics of High-Speed
Trains in Long, Steep Tunnels and Tunnel Group Environments
[J]. Tunnel Construction, 2024, 44(7): 1454-1464.
|
| [15] |
DENG Hong, WAN Youcai, MEI Yuangui.
Variation Pattern in Air
Resistance of a Train Passing Through Long and Extra-Long High-Speed
Railway Tunnels in Plateau Areas
[J]. Tunnel Construction, 2024, 44(7): 1491-1501.
|