| [1] |
CHENG Xuesong, XU Liankun, GENG Jia, LI Xiaofan, SONG Yanjie, LU Jiandong, WANG Shuxiong.
Partial Freezing Reinforcement Effect and Influencing
Factors of TJunction of Connection Gallery Bored by
Shield
[J]. Tunnel Construction, 2024, 44(1): 90-99.
|
| [2] |
HUANG Yi, LIU Zhenghao, MA Xianfeng, ZHU Yaohong, DONG Zibo.
Research on Cutting Test and Numerical Simulation of Segments
Used in Connection Passage with Mechanical Excavation Method
[J]. Tunnel Construction, 2022, 42(S1): 93-103.
|
| [3] |
LIU Fangming, GUO Meng.
Support Scheme for Deep Foundation Pit of Metro
Station with Connection
Gallery in Soft Soil
[J]. Tunnel Construction, 2021, 41(S2): 421-428.
|
| [4] |
ZHAI Zhiguo, HUA Nan, LIU Liu.
Application of Metro Jet System Horizontal Jet
Grouting Pile in Connection Gallery
of BeijingShenyang HighSpeed Railway Shield Tunnel
[J]. Tunnel Construction, 2021, 41(S2): 512-519.
|
| [5] |
SONG Jie.
Technology for Longdistance Shield Tunnel
Crossing Airport Area in Waterrich Sandy Cobble Strata
[J]. Tunnel Construction, 2020, 40(S1): 288-296.
|
| [6] |
WANG Shulei, GUAN Panfeng, DING Guosheng.
Risk Management in Early Stage of Connection Gallery
with Freezing Method: a Case Study on Freezing Project of Superlong
Connection
Gallery and Pump Station on Ziyang StationWuliting
Station of
Fuzhou
Rail Transit Line 2
[J]. Tunnel Construction, 2020, 40(S1): 258-265.
|
| [7] |
ZHU Yaohong, GAO Yimin, DONG Zibo, LIU Xian.
Fullscale Experimental Study on Structural Mechanism of TconnectedTunnel Constructed by Shield Method
[J]. Tunnel Construction, 2020, 40(1): 9-18.
|
| [8] |
DING Jianmin, DONG Zibo, MO Zhenze, JIN Yongfu, DING Jian, WANG Nailong.
Field Experimental Study on T-connected Tunnel with Pipe Jacking Method
[J]. Tunnel Construction, 2020, 40(1): 28-34.
|
| [9] |
WANG Kun, YE Lei, CHENG Yonglong, GAO Wenliang, ZHANG Shuqi, ZHENG Liangkui .
Sealing Device for Launching and Receiving of Tunneling Machine for Connection Gallery with Mechanical Excavation Method
[J]. Tunnel Construction, 2020, 40(1): 134-142.
|
| [10] |
LI Shang.
Research on Entrance/Exit Design of Connection Gallery of Underground Garage
[J]. Tunnel Construction, 2019, 39(2): 261-267.
|
| [11] |
MA Jun, HU Daoyun, YANG Ping.
Horizontal Freezing and Measurement Analysis of Plane Oblique Connection Gallery
[J]. Tunnel Construction, 2019, 39(12): 1965-.
|
| [12] |
ZHU Yaohong, WANG Jingyu, DONG Zibo, LIU Jianguo.
Design of Sealing Gasket of Connection Gallery Bored by Shield and Its Waterproofing Test
[J]. Tunnel Construction, 2019, 39(1): 110-118.
|
| [13] |
WANG Zhugang, CAO Zhen, LI Zhizhong.
Technologies for Shield Cutting Tool Replacement under Hyperbaric Condition in Waterrich and Compact Sandy Stratum of Xi’an Metro
[J]. Tunnel Construction, 2017, 37(1): 97-102.
|
| [14] |
LIU Miao.
Analysis of Influence of Construction of Access Section of Xi’an Metro on Existing Shield Tunnels
[J]. Tunnel Construction, 2016, 36(7): 826-831.
|
| [15] |
LIU Jinxiang, CAI Hui.
Some Issues on Shield Type Selection in Sandy Stratum: Case Study on TJSG-4 Bid Section on No. 3 Line of Xi’an Metro
[J]. Tunnel Construction, 2015, 35(S2): 171-175.
|