Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 79-84.DOI: 10.3973/j.issn.1672-741X.2012.z1.017
Previous Articles Next Articles
LIU Dan
Received:
Revised:
Online:
Published:
Abstract:
The traditional method can not guarantee the construction of connection gallery in Xi’an Metro. The WSS grouting reinforcement methods in tunnel are proposed. The keys of the mentioned method are the position of the grouting holes and the grouting matching and parameters. The paper can provide references for the construction of connection gallery of Xi’an Metro.
Key words: Xi’an Metro, connection gallery, WSS grouting
LIU Dan. Analysis on Construction of Connection Gallery at WSS Grouting Reinforcement Section of Xi’an Metro[J]. Tunnel Construction, 2012, 32(增刊1): 79-84.