| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
ZHU Yeting, ZHAO Jian, BI Xiangli, ZHU Yanfei, YU Ning, WANG Xiuzhi, HUANG Dezhong, QIN Yuan.
Engineering Verification of Parallel Control Technology for Automatic Shield Tunneling and Segment Assembly
[J]. Tunnel Construction, 2025, 45(8): 1602-1614.
|
| [3] |
ZHU Yeting, BI Xiangli, ZHU Yanfei, YU Ning, WU Di, QIN Yuan, WANG Zhihua, JIANG Haibo.
Retrofit and Engineering Practice of Automatic Tunneling Attitude Control for Existing Metro Shield Machines
[J]. Tunnel Construction, 2025, 45(7): 1378-1386.
|
| [4] |
ZHANG Hongda, MENG Xianjun, HAN Weifeng, ZHANG Chanjuan, JIANG Yongcheng, ZOU Qiang.
Fault Diagnosis Strategy for Magnetostrictive Sensor
Test Platform Based on Steady State Recognition
[J]. Tunnel Construction, 2025, 45(4): 730-739.
|
| [5] |
CHEN Gang, ZHU Yeting, WANG Zhihua, WANG Xiuzhi, QIN Yuan, ZHANG Zixin.
Experimental Study on
Thrust Vector Self-Adaptive Control Technology for Shield Tunneling in Soft Soil Strata
[J]. Tunnel Construction, 2024, 44(11): 2159-2170.
|
| [6] |
LIU Xingen, WANG Bozhi, LIU Xiaodi.
Track Deviation Correction Method of Shield Based on
Space S-Curves
[J]. Tunnel Construction, 2023, 43(S1): 457-463.
|
| [7] |
ZHANG Shengbin, LIU Jiguo, LIU Xialin, SHU Heng, CHENG Yong, ZHAO Qiang, MA Baosong.
A Model Test Device Based on Horizontal Directional
Drilling
[J]. Tunnel Construction, 2023, 43(9): 1455-1462.
|
| [8] |
WANG Hejun, TANG Jiuke, LIU Yuyang, ZHANG Pengpeng, XI Longlong.
Development and Validation of Test Device to Detect
Calcium Precipitation and Water Environment Changes in Tunnel
Shotcrete Under Pressurized Infiltration
[J]. Tunnel Construction, 2023, 43(5): 779-788.
|
| [9] |
LI Gongyi.
Fault Analysis and Countermeasures for Screw Conveyor
of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section
[J]. Tunnel Construction, 2022, 42(S2): 502-507.
|
| [10] |
LIU Jiajun, YANG Guang, WANG Junjie, HAN Weifeng, CAI Jun, ZHAO Xiangbo.
Development and Application of Intelligent Grease
Monitoring Device for Shield Based on Phase Laser Sensor
[J]. Tunnel Construction, 2022, 42(S2): 525-532.
|
| [11] |
CHEN Qiankun.
EnlargingDiameter Modification of
Composite Cutterhead of Shield Based on ANSYS
[J]. Tunnel Construction, 2022, 42(S2): 533-540.
|
| [12] |
LIU Hua.
Experimental Research on Key Parameters of Main Drive
HighPressure Sealing System of Tunnel Boring
Machines
[J]. Tunnel Construction, 2022, 42(9): 1622-1627.
|
| [13] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|
| [14] |
ZHOU Xuan, LI Pengfei, XIAO Mingqing, ZHANG Dingli, GONG Yanfeng.
Model Test Study on AntiClogging Performance of
Geotextile for Tunnel Drainage
[J]. Tunnel Construction, 2021, 41(9): 1516-1523.
|
| [15] |
LI Jianbin.
Current Status, Problems and Prospects of Research,
Design, and Manufacturing of Boring Machine in China
[J]. Tunnel Construction, 2021, 41(6): 877-896.
|