ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (3): 281-286.DOI: 10.3973/j.issn.1672-741X.2012.03.004

• wenzhang • Previous Articles     Next Articles

Effective Vibrationminimizing Blasting Technology: Case Study on  Changhongling Tunnel Crossing underneath Jiangchi Town

RUAN Qinglin   

  1. (China Railway Tunne Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2012-04-26 Revised:2012-05-02 Online:2012-06-20 Published:2012-07-09

Abstract: Changhongling tunnel on ChongqingLichuan railway crosses underneath Jiangchi town. In the construction of the towncrossing section of the tunnel, vibrationminimizing blasting tests are performed by using electronic detonators. The mentioned tests are carried out under the guidance of interference vibrationminimizing theory. The vibrationminimizing blasting is monitored, and the blasting parameters are optimized. Fullface vibrationminimizing blasting technology with electronic detonators, which achieves less than 1.0cm/s blasting vibration velocity under the condition of about 30m distance, is established. In the end, the blasting vibration velocity is reduced, the safety of the surface buildings is guaranteed, the primary support of the tunnel is reduced and the construction efficiency is improved.

Key words: Changhongling tunnel, tunneling underneath surface buildings, electronic detonator, vibration monitoring, vibrationminimizing blasting 