| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
YANG Youquan, LIN Chungang, SONG Renjie, SU Hang, LI Yage, ZHOU Zhibin, ZHANG Danfeng, WU Yimin, FU Helin.
A Review of Intelligent Surrounding Rock Classification Methods for Drill-and-Blast Tunnels Based on Image Recognition, While-Drilling Parameters, and Multi-Source Fusion
[J]. Tunnel Construction, 2026, 46(S1): 29-51.
|
| [3] |
GUO Yanhui, BI Wei.
Carbon Emission Analysis of Fully Electrified Integrated Equipment Systems in Highway Tunnel Construction: A Case Study of Qiaojia Tunnel in Yunnan, China
[J]. Tunnel Construction, 2026, 46(S1): 164-175.
|
| [4] |
LI Zixiang, XIE Weishuai, CAI Haibing, HOU Gongyu.
Analytical Solution for Shield Segment Internal Forces Based on Elastic Hinge Ring Method Considering Nonuniformly Distributed Earth Pressure on Arch Back and Nonlinear Behavior of Composite Strata
[J]. Tunnel Construction, 2026, 46(S1): 271-282.
|
| [5] |
WU Haosheng, LIU Jianguo, FU Yi, ZHANG Jianqiang, GUO Zhihui, ZHANG Ming, MULATI· Jueraiti, ZENG Lingjiang, DU Jiaxin, LIU Tuojiang.
Development and Field Testing of Tunnel/Roadway Blasting-Induced CO Photocatalytic Purification Device
[J]. Tunnel Construction, 2026, 46(S1): 361-374.
|
| [6] |
PENG Chunlin, YU Zegang, XU Dehuai, LIU Liang.
Spatiotemporal Evolution Patterns and Hierarchical Control Technologies for Large Deformations in Extremely Soft Rock Tunnels: A Case Study of Adit #12-1 in Yangtze River-to-Hanjiang River Water Diversion Project
[J]. Tunnel Construction, 2026, 46(S1): 495-505.
|
| [7] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [8] |
YUAN Zhenzhong, FANG Zhongqiang, YUE Ben, YU Zihan, WANG Wei, XU Zhisheng.
Smoke-Spread Distance of a Unilateral Centralized Exhaust With Symmetric Openings of Smoke-Exhaust Valves in Inclined Tunnels
[J]. Tunnel Construction, 2026, 46(9): 1874-1884.
|
| [9] |
ZHANG Hongjun, ZHAO Jiawei, WANG Shuwang, SONG Zhanping, XU Hong, DONG Zhiwei, HU Ruoqi.
Comparative Life Cycle Assessment of Carbon Emissions and Environmental Impacts From U-Shaped Shield Tunneling and Cut-and-Cover Construction of Shallow-Buried Utility Tunnels: A Case Study of EA4 Bid Section Project in Xiong’an New Area
[J]. Tunnel Construction, 2026, 46(9): 1885-1903.
|
| [10] |
TANG Langzhou, WU Lei, ZHENG Li, YU Li, CUI Zhen.
Theoretical Calculation Method for Seismic Analysis of Double-Arch Tunnels Under Near-Fault Ground Motions
[J]. Tunnel Construction, 2026, 46(9): 1916-1933.
|
| [11] |
QI Huan, REN Dali, LUO Guoyan, LI Mingxu, ZHANG Yuliang, YIN Weisong.
Influence of Bedding Plane Dip Angle on Stability of Surrounding Rock in Deep Water Conveyance Tunnel and Control Methods
[J]. Tunnel Construction, 2026, 46(9): 2011-2023.
|
| [12] |
JIANG An, HU Zheng, YANG Zhongxuan.
Analytical Solution for Complex Longitudinal Periodic Seepage Fields Around Lined Tunnels Under Wave Loading
[J]. Tunnel Construction, 2026, 46(8): 1703-1714.
|
| [13] |
HU Bin, XING Yonghui, WANG Honggang.
Overall Design Scheme of Shayuzhou Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2026, 46(8): 1762-1774.
|
| [14] |
XIA Caichu, LIU Shaohua, LI Xing, PENG Yiliang, XU Yingjun, XU Chen.
Crack Propagation Patterns of Surrounding Rock in Gas Storage Caverns Based on Inelastic Phase-Field Method
[J]. Tunnel Construction, 2026, 46(7): 1402-1412.
|
| [15] |
ZHANG Shishu, DENG Xingfu, CHENG Lijuan, LU Wei, JIANG Zhongming, YANG Xue, LIU Chenzhi, HUANG Xiangyi, LIAO Junhui, SHI Zhaofeng, XIAO Ningning, YIN Chonglin.
Reconstruction Method of Idle Hydropower Caverns for Compressed Air Energy Storage
[J]. Tunnel Construction, 2026, 46(7): 1533-1545.
|