Stationcrossing Technologies of Open TBM:  Case Study on No. 6 Line of Chongqing MRT

ZHU Wenhui1, WENG Chengxian1, CHEN Jing2   

  1. (1. TYLIN International, Chongqing 401121, China;  2. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, China)
  • Received:2012-02-01 Revised:2012-06-30 Online:2012-10-20 Published:2012-10-30

Abstract: The stationcrossing technologies of TBM, including driving technology and stepping technology, are studied, so as to realize the synchronization of TBM crossing station and station construction. Special construction plans are made before construction, the structure types of the stations are optimized and the ground surface facilities and assistant equipments are transferred by using the intermediate stations. The following results have been achieved: 1) The TBM has crossed 6 stations successfully; 2) The rapid singledirection driving of the TBM is guaranteed; 3) The construction organization between the TBM tunneling and the station construction is well coordinated. 

Key words: No. 6 line of Chongqing MRT, open TBM, driving, stepping, stationcrossing, sitetransferring, structure design