ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (6): 838-842.DOI: 10.3973/j.issn.1672-741X.2012.06.016

• wenzhang • Previous Articles     Next Articles

Study on Foundation Treatment of Opencut Tunnel Located in  Waterrich Sandy Cobble Ground

ZHAI Ke   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2012-09-13 Revised:2012-10-09 Online:2012-12-20 Published:2012-12-28

Abstract: The foundation of an opencut tunnel is located in waterrich sandy cobble ground. The particles of the ground will be lost due to the dynamic ground water, which may cause serious settlement to the foundation of the tunnel. Two types of consolidation methods, i.e., “full consolidation+drain pass” method and stripshaped consolidation method, are studied for the consolidation of the foundation of the opencut tunnel. In the end, stripshaped consolidation method is adopted on basis of study results. The field monitoring data show that stripshaped consolidation method can meet the requirements of the works and is suitable for the consolidation of the foundation of tunnels located in waterrich sandy cobble ground.

Key words: opencut tunnel, waterrich sandy cobble ground, dynamic ground water, stripshaped consolidation, full consolidation+drain pass, postconstruction settlement