ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2013, Vol. 33 ›› Issue (10): 830-835.DOI: 10.3973/j.issn.1672-741X.2013.10.006

Previous Articles     Next Articles

Reinforcement Design of and Stress Analysis on Highspeed Railway Tunnel Lining at OCS Anchor Overlaps

ZHAO Licai   

  1. (China Railway 19th Bureau Group Co., Ltd., Beijing 100176, China)
  • Received:2013-07-22 Revised:2013-08-18 Online:2013-10-20 Published:2013-10-24

Abstract:

Reinforcement, including chemical anchor bolt, steel plate and inclined support, is made at the positions of lining with OCS anchor overlaps and midpoint anchors, in order to ensure the concrete to meet the stress limit of the drop tubes. The effect of the reinforcement described is studied by checking the concrete rigidity and the drop tube stress and by means of FLAC3D3.0 finite element numerical simulation. The study results show that the calculation results are consistent with the actual conditions. The practice proves that the reinforcement made is feasible and safe and that good social and economic benefits can be achieved. This paper can provide technical support and theoretical reference for similar projects in the future.

Key words: highspeed railway tunnel, overlap of OCS anchor section, midpoint anchor, lining reinforcement, drop tube, numerical simulation