| [1] |
RONG Miren, FENG Chao, PANG Yinping, LUO Lanxin, YUAN Ying, GENG Dongyang, ZHENG Yongrui, LI Jiayin.
Metro Settlement Prediction Based on Wavelet Threshold Denoising-Phase Space Reconstruction Data Processing and Grid Search Method-Optimized Support Vector Machine Regression Model
[J]. Tunnel Construction, 2025, 45(11): 2033-2043.
|
| [2] |
SONG Hongzhuo, JIANG Annan, RUAN Yingying, MIN Qinghua.
Construction Analysis of Water-Rich Tunnels Based on Hoek-Brown Elastoplastic Hydraulic-Mechanical-Damage Coupling Model
[J]. Tunnel Construction, 2024, 44(S2): 342-351.
|
| [3] |
YANG Minghui, SONG Muyuan, YAO Gaozhan, CHEN Wei, ZUO Guolian, CAI Zhiyuan.
Research Progress and Prospects for Machine Learning in Predicting Surface Settlement Induced by Shield Tunneling
[J]. Tunnel Construction, 2024, 44(11): 2119-2132.
|
| [4] |
JIANG Tao.
Automatic Welding
Technology for Steel Segment Lining of Metro Tunnel
[J]. Tunnel Construction, 2024, 44(11): 2283-2292.
|
| [5] |
BAO Yan, MEI Chongbin, XU Pengyu, SUN Zhe, WEN Yucheng.
Crack Identification in
Metro Tunnels Based on Improved YOLOv8 Algorithm
[J]. Tunnel Construction, 2024, 44(10): 1961-1970.
|
| [6] |
YI Guoliang, CHEN Kui, LU Gaoming, ZHOU Jianjun, FAN Wenchao.
Progress in Shield Tunneling Technology for Urban Underground
Space in China
[J]. Tunnel Construction, 2024, 44(1): 1-20.
|
| [7] |
MA Gang, KANG Zuo, GAO Huyan, YU Wenlong, KANG Jiawei.
Analysis on Safety Risk of Urban Metro Tunnel
Construction in Saturated Soft Loess Stratum and Its Countermeasures
[J]. Tunnel Construction, 2023, 43(S1): 425-433.
|
| [8] |
GUAN Hao, LIU Wei, WANG Feng, ZHAO Huajing, ZHANG Gong, ZHANG Gaohai.
Prediction of Surface Settlement Caused by Shield
Tunneling Based on Data Enhancement and Machine
Learning Algorithm
[J]. Tunnel Construction, 2022, 42(S1): 331-341.
|
| [9] |
XI Hongbing, LI Baisheng.
Deterioration Performance of Tunnel Lining Support
Shotcrete under SulfateFreezeThaw
Interaction
[J]. Tunnel Construction, 2022, 42(7): 1219-1226.
|
| [10] |
ZHANG Qing, WANG Hongchao, ZHAO Yao, SHAO Jingqi, GAO Ziming, ZHANG Lianzhen, CHEN Jian, WANG Chong, YU Lei.
Stability Analysis of New Tunnel Obliquely Crossing underneath Adjacent Existing Tunnel with Small Angle: a
Case Study of a Tunnel of Qingdao Metro Line 8
[J]. Tunnel Construction, 2021, 41(S2): 199-208.
|
| [11] |
LIU Chunmei, JIANG Wei, GONG Yafeng, LIN Siyuan.
Analysis and Prediction of Foundation Pit Deformation
Based on Kmeans Improved Radial Basis Function Neural
Network
[J]. Tunnel Construction, 2021, 41(S2): 246-254.
|
| [12] |
LIU Linsheng, LI Yang, LI Weiteng, LI Yongshun, WANG Ke.
Prestress Effect of End Anchor Bolt in Mined Metro
Station
[J]. Tunnel Construction, 2021, 41(S2): 255-260.
|
| [13] |
HE Rongguo, ZHANG Xiaoyong, WANG Xu, ZHAO Ziyue, AN Shunbiao.
Analysis and Prediction Method for Metro Tunnel Monitoring
Data Based on Deep Learning
[J]. Tunnel Construction, 2021, 41(S2): 261-267.
|
| [14] |
BAI Xiangrui, RONG Xiaoli, WEN Zhu, ZHANG Ning.
Prediction of Surface Settlement in Construction Stage
of Earth Pressure Balance Shield Tunnel Based on
Differential Evolution AlgorithmSupport Vector Regression Machine
[J]. Tunnel Construction, 2021, 41(S2): 336-345.
|
| [15] |
LU Yaobang, LIU Yongsheng, FAN Xiaodong.
Rapid Detection Method for Surface Defect for Metro
Tunnel Structure and Its Application
[J]. Tunnel Construction, 2021, 41(S2): 655-663.
|