Tunnel Construction ›› 2013, Vol. 33 ›› Issue (7): 573-578.DOI: 10.3973/j.issn.1672-741X.2013.07.008
Previous Articles Next Articles
PANG Tao
Received:
Revised:
Online:
Published:
Abstract:
No. 2 Sizhai tunnel on GuiyangGuangzhou railway crosses underneath the existing Ruipo tunnel on XiamenChengdu expressway with a small angle. Theoretical analysis, numerical simulation and site monitoring are made to achieve a safe and economic design of the tunnel. Main study contents and conclusions drawn are as follows: 1) No. 2 Sizhai tunnel, which crosses underneath the existing tunnel with a small angle, is located in fractured rock mass, therefore the scope of the influence induced by the construction of No. 2 Sizhai tunnel is large. The influence scope can be analysed by means of Peck formula. 2) The settlement control standard of the existing tunnel can be defined on the prerequisite that the structural safety of the existing tunnel is guaranteed. 3) The preliminary design of the tunnel can be verified by means of numerical simulation, and therefore the construction methods and countermeasures can be optimized.
Key words: GuiyangGuangzhou railway, design concept, tunnel crossing underneath existing tunnel, deformation control
PANG Tao. Case Study on Design of a Railway Tunnel Crossing Underneath an Existing Highway Tunnel with a Small Angle[J]. Tunnel Construction, 2013, 33(7): 573-578.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2013.07.008
http://www.suidaojs.com/EN/Y2013/V33/I7/573