Tunnel Construction ›› 2022, Vol. 42 ›› Issue (S2): 345-351.DOI: 10.3973/j.issn.2096-4498.2022.S2.043

Previous Articles     Next Articles

Integrated Construction Scheme of Municipal Bridges and Metro Stations Considering Geological Condition: a Case of University City South Station in Chongqing

HUANG Hanxiao1, WEI Liangwen1, 2, *, YAN Yuxin1   

  1. (1. School of Civil Engineering, Chongqing Jiaotong Uniersity, Chongqing 400074, China; 2. State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China)

  • Online:2022-12-30 Published:2023-03-24

Abstract: When municipal bridge and metro station are jointly built, the structural safety and normal use of the two different structures must be considered, and the structure can also be reasonably stressed. Two schemes of "connection of low transfer beams" and "bridge pier and station roof consolidation and partial replacement" are compared, and the bearing capacity, deformation and seismic capacity of each structure are analyzed through a threedimensional stratumstructure model. The research results show that it is difficult to design and construct the integrated structure with "low transfer beam connection scheme", and the transfer structure needs to be inspected and maintained during operation period; the integrated structure can be carried out using "bridge pier and station roof consolidation and partial replacement scheme". Such problems are effectively avoided, and the stress of the station slab, wall, column, and other structures is improved compared with the "low transfer beam scheme". The bearing capacity and deformation of each structure meet the requirements.

Key words: metro station, municipal bridge, integrated construction, stratastructure model, stress analysis, deformation control, seismic analysis