| [1] |
YANG Ping, LI Jinghao, ZHANG Ting.
Application Status and Prospects of Artificial Ground Freezing Technology in China
[J]. Tunnel Construction, 2026, 46(5): 895-918.
|
| [2] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [3] |
HU Min, PEI Liefeng, WU Bingjian, SUN Junchao, LU Jing.
Current Situation and Prospect of Shield Automatic
Driving Technology
[J]. Tunnel Construction, 2023, 43(3): 383-391.
|
| [4] |
HU Changming, FENG Lili, LI Liang, YU Xiangtao, LI Zengliang.
Surface Settlement Control and Parameter Optimization
of Shield Tunneling Based on Machine Learning
[J]. Tunnel Construction, 2023, 43(12): 1985-1995.
|
| [5] |
WANG Jinfeng, XIE Qiyong, XU Jinbin, LI Jieyuan, WANG Pan.
Micro Settlement Control Technology for Shield Tunnel
Closely Crossing Underneath Existing Metro Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 372-380.
|
| [6] |
YANG Hui, PEI Junhao, ZHU Jibin, LIU Ning, JIANG Xiaobo, LAI Qingzhao.
Construction Safety Technology of ShallowBuried
LargeCrossSection Tunnel Portal Crossing Underneath Operational Highway
[J]. Tunnel Construction, 2022, 42(S2): 440-448.
|
| [7] |
JIA Lianhui, CHEN Wentao, FAN Lei, YUAN Zheng.
Design and Application of Key Systems of SuperLarge
Rectangular CrossSection Pipe
Jacking Machine: a Case Study on Pipe Jacking Project
of Changshui Road Crossing underneath Nanhu Avenue in
Jiaxing, China
[J]. Tunnel Construction, 2022, 42(5): 917-928.
|
| [8] |
WU Liecheng, HAUNG Dezhong, QIU Yan.
Settlement Control Technology in Metro Station
Construction with Large Cross-Section
Rectangular Pipe Jacking Method: a Case Study of
Jing′an
Temple Station of Line No.14 of Shanghai Metro
[J]. Tunnel Construction, 2021, 41(9): 1585-1593.
|
| [9] |
LI Haiyang.
Analysis of Settlement Control of Bridge Induced by
Undercrossing of Fourline Overlapping Smallspacing Shield Tunnels
[J]. Tunnel Construction, 2020, 40(S1): 343-349.
|
| [10] |
LIU Fengzhou, XIE Xiongyao, WANG Qiang, ZHOU Biao.
Development of Realtime Interaction Platform of
Multisource Data for Shield
Tunneling Settlement
[J]. Tunnel Construction, 2020, 40(S1): 82-89.
|
| [11] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
| [12] |
LIU Jianyou, ZHAO Zhenhua, HAN Lin, LIU Chunxiao.
Subgrade Settlement Control Standards for Shield Tunnel Crossing underneath Highspeed Railway
[J]. Tunnel Construction, 2020, 40(2): 256-260.
|
| [13] |
YANG Jianfeng, ZHENG Yuchao, CHEN Qiang, YAN Shiyou.
A Case Study on Settlement Control of Shield Tunneling under Existing Metro Tunnel
[J]. Tunnel Construction, 2019, 39(S2): 385-392.
|
| [14] |
YAO Xianli.
Construction Technology of Metro Shield Continuously Crossing underneath Riverway and Railway in Silt Layer in Israel
[J]. Tunnel Construction, 2019, 39(5): 858-867.
|
| [15] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|