Tunnel Construction ›› 2014, Vol. 34 ›› Issue (3): 274-279.DOI: 10.3973/j.issn.1672-741X.2014.03.016
Previous Articles Next Articles
FENG Huanhuan1, YANG Shujiang2
Received:
Revised:
Online:
Published:
Abstract:
Located in gravel strata, the fourth bid section of Phase I project of Line 4 of Chengdu Metro is built by an EPB shield. In the paper, the harmonized control of the key boring parameters is analyzed in terms of advance speed, thrust, cutterhead torque, muck releasing quantity, simultaneous grouting and excavation chamber pressure, so as to ensure the stability of the tunnel face and to ensure safe and efficient boring. The causes for the difficulties encountered in tunneling, including rotation of segment rings, boring along smallradius curves and delayed settlement, are analyzed and countermeasures are proposed, so as to ensure good works quality.
Key words: Metro, gravel strata, EPB shield, harmonized parameter control, smallradius curve, segment rotation, delayed settlement
FENG Huanhuan, YANG Shujiang. Tunneling by EPB Shield in Gravel Strata: Case Study on Line 4 of Chengdu Metro[J]. Tunnel Construction, 2014, 34(3): 274-279.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/ 10.3973/j.issn.1672-741X.2014.03.016
http://www.suidaojs.com/EN/Y2014/V34/I3/274
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network