[1] |
LIU Yi, ZHU Liangcheng.
Current Status and Future Perspectives of Urban Underground Space Development in Shanghai
[J]. Tunnel Construction, 2020, 40(7): 941-952.
|
[2] |
HUANG Zhangjun, YANG Yanling, TANG Dongsang, ZHANG Weizhong.
Numerical Simulation and Monitoring of Reaction Wall
of Launching Shaft for Large Rectangular Pipe Jacking
[J]. Tunnel Construction, 2020, 40(7): 972-980.
|
[3] |
石晓冬, 赵怡婷, 吴克捷.
生态文明时代超大城市地下空间科学规划方法探索——以北京城市地下空间规划建设为例
[J]. Tunnel Construction, 2020, 40(5): 611-620.
|
[4] |
WU Yanxing, XIAO Wei, ZHOU Qian, SUN Lei, XU Guangyi.
Design and Research of Open Type Rectangular Pipe Jacking Machine
[J]. Tunnel Construction, 2020, 40(4): 591-596.
|
[5] |
SUN Jun.
Development and Some Issues on Exploitation and Utilization of Urban Underground Space in China and Abroad
[J]. Tunnel Construction, 2019, 39(5): 699-709.
|
[6] |
HE Shanning, DOU Xiaotian, ZHAO Liyong, CUI Xianhui, WANG Jinbo, BAO Qingfeng.
Analysis of Thrust Force of Adjacent Construction of Shallowburied Rectangular Pipe Jacking Tunnel Group
[J]. Tunnel Construction, 2019, 39(3): 383-390.
|
[7] |
GAO Yi, FENG Chaoyuan, CHENG Peng.
Application of Structural Cut and Convert Method to Underground Space Development
[J]. Tunnel Construction, 2019, 39(3): 398-406.
|
[8] |
WANG Ning, GAO Yi, YU Shaohui, LI Yang.
Disturbance of Rectangular Pipe Jacking Tunnel Group Construction on Soil Behind Working Shaft
[J]. Tunnel Construction, 2019, 39(3): 413-420.
|
[9] |
HU Jingjun, DOU Xiaotian, LI Zhijun, WANG Jinbo, ZHAO Liyong, LI Yongqiang.
Boring Attitude Control Technology for Shallowcovered and Smallspacing Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 465-472.
|
[10] |
DOU Xiaotian, WANG Hekun, CAO Weiming, WANG Jinbo, ZHAO Liyong, RAN Jingpeng.
Cause Analysis and Treatment Measures for OverallCarryingSoil Effect of Shallowburied Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 473-479.
|
[11] |
GAO Yi, YU Shaohui, LI Yang, CHENG Peng, LUO Yutian, FENG Chaoyuan.
Structural Cut and Convert Method for Largescale Underground Space
[J]. Tunnel Construction, 2019, 39(3): 480-487.
|
[12] |
LI Yang, GAO Yi, YU Shaohui, CHENG Peng, LUO Yutian.
Application of Structural Cut and Convert Method to Construction of Underground Parking Lot
[J]. Tunnel Construction, 2019, 39(3): 488-495.
|
[13] |
FAN Lei, JIANG Pengpeng, XUE Guangji.
Key Technologies of Splitunit Rectangular Pipe Jacking Machine: a Case Study of CREG Underground Parking Lot
[J]. Tunnel Construction, 2019, 39(3): 504-510.
|
[14] |
HAN Zhanbo, DOU Xiaotian, CAO Weiming, WANG Jinbo, ZHAO Liyong, ZHENG Lijun.
Control Technology for Surface Deformation Induced by Construction of Shallowcovered and Smallspacing Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 496-503.
|
[15] |
XIONG Haoxiang, REN Hui, WENG Yuanlin.
Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(2): 281-286.
|