| [1] |
CAO Jiahuai, LYU Pengcheng.
Early-Age Cracking Risk Analysis and Control Practice for Mass Concrete in An Immersed Tunnel Project: A Case Study of Mingzhu Bay Tunnel
[J]. Tunnel Construction, 2026, 46(S1): 506-518.
|
| [2] |
LIU Binyuan, LUO Yanbin, TAN Chang, YANG Zhenxing, LYU Qianqian, CHEN Zhigang, LIU Weiwei.
Research and Application of a Real-Time Intelligent Early Warning Model for TBM Jamming Risk Based on Transformer Multi-Task Learning
[J]. Tunnel Construction, 2026, 46(8): 1729-1739.
|
| [3] |
YI Xuanxuan, PAN Ting, DU Zhigang, HE Shiming.
Experimental Study on Optimization of Fatigue-Sensitive Zones for Extra-Long Urban Tunnels Based on Simulated Driving
[J]. Tunnel Construction, 2026, 46(2): 310-321.
|
| [4] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [5] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [6] |
PEI Chao, LIU Yanping.
Optimization of Hydration Heat Control Scheme for Full-Section Casting of Immersed Tube Tunnels Based on Orthogonal Experiments
[J]. Tunnel Construction, 2025, 45(8): 1469-1482.
|
| [7] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [8] |
SHI Fei.
Optimization of Passenger Flow in Single-Story
Side Transfer Stations
[J]. Tunnel Construction, 2025, 45(5): 975-981.
|
| [9] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [10] |
WANG Zuo, ZHANG Chi, JIAO Yuqi, LIN Xuancai, YAN Jiaqiang.
Geometric Design Indices of
Freeway Underground Interchange Ramps
Based on Driving Load
[J]. Tunnel Construction, 2025, 45(2): 256-267.
|
| [11] |
WU Senyang, CHEN Xiang, CHEN Peng, ZENG Yuhan.
Construction Risk Control
of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang
Metro Station in Guangzhou, China
[J]. Tunnel Construction, 2025, 45(2): 382-391.
|
| [12] |
NI Jiaze, LI Xiang, ZHANG Jinzhang, HUANG Hongwei.
Structural Safety Risk Analysis of Subsea Tunnels Crossing Fault Zones in Jiaozhou Bay Second Subsea Tunnel
[J]. Tunnel Construction, 2025, 45(12): 2287-2297.
|
| [13] |
LYU Haimin, LIU Xiang, HAN Kaihang, CHEN Xiangsheng, DONG Zijun, ZHANG Jiaxuan.
Assessment Methods and Perspectives on Extreme Rainfall-Induced Flood Risks in Urban Underground Spaces
[J]. Tunnel Construction, 2025, 45(11): 1981-1993.
|
| [14] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [15] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|