ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (4): 354-358.DOI: 10.3973/j.issn.1672-741X.2015.04.012

Previous Articles     Next Articles

Design of Seamless Transfer between Metro Station and Bus:Case Study on Financial HiTech Zone Station on GuangzhouFoshan Line

WANG Yang   

  1. (Real Estate Head Office of Guangzhou Metro Corporation, Guangzhou 510000, Guangdong, China)
  • Received:2015-01-13 Revised:2015-03-12 Online:2015-04-20 Published:2015-04-22

Abstract:

The quality of transfer between Metro station and bus will be improved if a good transfer design can be made. In this paper, the development trend and design principle of seamless transfer between Metro station and bus are analyzed, and the basic design principle is discussed. The transfer design of Financial HiTech Zone station on GuangzhouFoshan Line is discussed. The design principles include nonstop transfer, humanization and safety. The design policies include shortening the transfer distance, ventilation mode selection and firefighting design.

Key words: Metro, bus, seamless transfer, function organization, traffic organization, humanized design, firefighting design

CLC Number: