ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (4): 354-358.DOI: 10.3973/j.issn.1672-741X.2015.04.012
Previous Articles Next Articles
WANG Yang
Received:
Revised:
Online:
Published:
Abstract:
The quality of transfer between Metro station and bus will be improved if a good transfer design can be made. In this paper, the development trend and design principle of seamless transfer between Metro station and bus are analyzed, and the basic design principle is discussed. The transfer design of Financial HiTech Zone station on GuangzhouFoshan Line is discussed. The design principles include nonstop transfer, humanization and safety. The design policies include shortening the transfer distance, ventilation mode selection and firefighting design.
Key words: Metro, bus, seamless transfer, function organization, traffic organization, humanized design, firefighting design
CLC Number:
U 459.3
WANG Yang. Design of Seamless Transfer between Metro Station and Bus:Case Study on Financial HiTech Zone Station on GuangzhouFoshan Line[J]. Tunnel Construction, 2015, 35(4): 354-358.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.04.012
http://www.suidaojs.com/EN/Y2015/V35/I4/354
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network