Tunnel Construction ›› 2015, Vol. 35 ›› Issue (9): 949-956.DOI: 10.3973/j.issn.1672-741X.2015.09.015

Previous Articles     Next Articles

Construction Technology for Bottom of Dry Dock of Honggu Immersed Tunnel in Nanchang

ZHAO Kanglin, WANG Qiulin, CUI Yuguo   

  1. (The Second Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2015-05-26 Revised:2015-07-15 Online:2015-09-20 Published:2015-09-22

Abstract:

The difficulties in the construction of the bottom of the dry dock of Honggu tunnel in Nanchang are presented. Countermeasures, including proper zone division of the dry dock bottom, zonal replacement filling, adopting angle steel for the sleeper beam, floating layers consisting of concrete and filtering channels and proper optimization of the drainage system, are adopted. In the end, the construction of the bottom of the dry dock has been completed successfully and relevant requirements have been complied with. 

Key words: immersed tunnel, bottom of dry dock, zone division, replacement filling, floating layer, filtering channel