ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S1): 80-84.DOI: 10.3973/j.issn.1672-741X.2015.S1.016

Previous Articles     Next Articles

Technology for Shield Boring of Tunnels on Smallradius Curves: Case Study on a Shieldbored Tunnel on Line 1 of Shijiazhuang Metro

LIU Dong   

  1. (Electrical Engineering and Urban Transit Engineering Co., Ltd.,  China Railway No. 5 Group Co., Ltd., Changsha 413000, Hunan, China)
  • Received:2015-04-20 Revised:2015-07-02 Online:2015-07-20 Published:2015-08-17

Abstract:

Problems such as axis deviation, segment offset and ground surface settlement may occur to shieldbored tunnels on smallradius curves. A section of the running tunnel from Huojuguangchang station to Shijiazhuangdong station on Line 1 of Shijiazhuang Metro is located on a smallradius curve. Countermeasures in terms of shield type selection, segment type selection, boring parameters, simultaneous grouting, secondary compensation grouting and segment bolt retightening are taken for the tunnel. In the end, the deviation of the axis of the completed tunnel has been controlled within the range from -50 to +50 mm, the offset of the segments has been controlled within 10mm and the ground surface settlement has been controlled within the range from -20 to +10 mm.

Key words: tunnel on smallradius curve, shield tunneling, thrust, axis, segment offset, grouting, bolt retightening, settlement

CLC Number: