ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 197-204.DOI: 10.3973/j.issn.1672-741X.2015.S2.036
Previous Articles Next Articles
LI Taomeng, SUN Haibo
Received:
Revised:
Online:
Published:
Abstract:
The disassembling of largediameter opentype TBM in tunnel has many difficulties and it is hard to be carried out. In this paper, the preparation and disassembling technologies for backup system and main body of Robbins TBM 335, used in XSQLS2 Bid Section of West Qinling tunnel on LanzhouChongqing Railway, are presented in detail. Meanwhile, some suggestions have been given.
Key words: West Qinling tunnel, largediameter opensype TBM, nondestructive disassembling, backup system, main body, main bearing
CLC Number:
U 455
LI Taomeng, SUN Haibo. Nondestructive Disassembling Technologies for Largediameter Opentype TBMs[J]. Tunnel Construction, 2015, 35(S2): 197-204.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.036
http://www.suidaojs.com/EN/Y2015/V35/IS2/197