Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 209-214.DOI: 10.3973/j.issn.1672-741X.2015.S2.038
Previous Articles Next Articles
GAO Xiang, WU Dexing, GUO Xiao
Received:
Revised:
Online:
Published:
Abstract:
Yongjiang River Crossing Tunnel in Ningbo, China, which was opened to traffic in 1995, is the first immersed tube tunnel in soft soil built in mainland China. In the paper, the design, construction, operation and rehabilitation of the tunnel are presented, the causes for the settlement and structural defects of the tunnel are analyzed, and some improvement and suggestions are made. The paper can provide reference for similar tunnels in the future.
Key words: Yongjiang River Crossing immersed tunnel, dry dock, dredging, towing, sinking, GINA water stop, health monitoring system
CLC Number:
U 455
GAO Xiang, WU Dexing, GUO Xiao. Case Study on Construction, Operation and Rehabilitation of Yongjiang River Crossing Immersed Tunnel in Ningbo, China[J]. Tunnel Construction, 2015, 35(S2): 209-214.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.038
http://www.suidaojs.com/EN/Y2015/V35/IS2/209