| [1] |
WANG Yi, ZHENG Wenbao, LUO Gang, LIU Jianping.
Multi-Objective Optimization of a Large-Diameter Shield Cutterhead System and Tunneling Parameters in Complex Strata
[J]. Tunnel Construction, 2026, 46(5): 1109-1120.
|
| [2] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [3] |
HAO Sihaowensong, LI Shuchen, LI Xuewei, LIU Richeng, YIN Weifang, XU Kechun.
Experimental Simulation of Electrochemical Synergistic De-adhesion for Mitigating Shield Cutterhead Clogging in Clayey Strata
[J]. Tunnel Construction, 2026, 46(3): 586-598.
|
| [4] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|
| [5] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [6] |
GONG Qiuming, HUANG Liu, LIU Yongqiang, XIE Xingfei, HAO Gang, ZHANG Fang.
Development of a Rock Mass Information System for TBM Tunneling Faces
[J]. Tunnel Construction, 2026, 46(2): 348-358.
|
| [7] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [8] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [9] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|
| [10] |
LI Xu, YU Hongwei, LIU Jianguo, YE Ming, REN Changchun, WU Gensheng, DONG Zikai.
A Rapid Sensing Method for Rock Mass Quality in TBM Tunnel Construction Based on Adaptive Particle Swarm Optimization-Probability Calibration-Extreme Gradient Boosting Model
[J]. Tunnel Construction, 2026, 46(1): 134-144.
|
| [11] |
XU Guangyi, QI Zhichong, ZHAO Zihui, JIA Tao, LI Ming, WU Hao, GENG Qi.
Design and Testing of a Cone-Shaped Cutterhead Based on Boring Method for Enlarged-Diameter Vertical Shafts
[J]. Tunnel Construction, 2026, 46(1): 194-203.
|
| [12] |
MAO Qingsong, HE Fei, JIA Lianhui, NING Xiangke, ZHANG Xiao, LIN Laikuang.
Simulation of Oxygen Concentration Distribution in High-Altitude TBM Construction Tunnels Based on Computational Fluid Dynamics
[J]. Tunnel Construction, 2025, 45(S2): 193-203.
|
| [13] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [14] |
LU Yao, HUANG Ming, GUAN Zhenchang, ZHOU Qi, SONG Hui, ZHENG Jinhuo, CAI Guangyuan.
Thermo-Mechanical Coupling Characteristics of EPB Shield Cutterhead Considering Foam-Conditioned Effect
[J]. Tunnel Construction, 2025, 45(S2): 222-235.
|
| [15] |
LI Daxu, XIE Yu, YANG Xiaofang.
Design of Double-Deck Underground Garage Link Roads Located Beneath Narrow Road Red Line
[J]. Tunnel Construction, 2025, 45(S2): 326-334.
|