Advanced Doubledrift Construction Technologies for Taoshuping Tunnel Crossing Waterrich Fine Silty Sand Strata

ZHANG Xuewen   

  1. (Headquarters of LanzhouChongqing Railway Project, China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Longnan 748500, Gansu, China)
  • Received:2015-03-26 Revised:2016-02-27 Online:2016-05-20 Published:2016-05-25

Abstract:

Taoshuping tunnel on LanzhouChongqing Railway is a Grade Ⅰ doubleline railway tunnel; it crosses waterrich fine silty sand strata. The surrounding rocks of the tunnel are bad and unstable. During the construction of Taoshuping Tunnel, large water inrush and softening of waterrich fine silty sand strata occur. As a result, doubledrift method is adopted to carry out drainage construction. The technical problem of the excavation of tunnel crossing waterrich fine silty sand strata has been solved and the deformation of primary support has been brought under effective control.

Key words: LanzhouChongqing Railway, Taoshuping tunnel, waterrich fine silty sand strata, advanced doubledrift method, draining