Tunnel Construction ›› 2016, Vol. 36 ›› Issue (8): 1004-1010.DOI: 10.3973/j.issn.1672-741X.2016.08.017

Previous Articles     Next Articles

Feasibility Analysis of Vertical Belt Conveyor Used  in TBM Construction of Metro

QI Mengxue   

  1. (Tunnel Engineering Co., Ltd., China Railway 18th Bureau Group, Chongqing 400700, China)
  • Received:2016-02-29 Revised:2016-04-13 Online:2016-08-20 Published:2016-08-17

Abstract:

In recent years, the Metro tunnel construction in rock strata has become more and more common in China. The TBM construction speed is restricted by method of vertical mucking by gantry crane used in doubleshield TBM tunneling in Qingdao. The effect of vertical mucking by gantry crane used in EPB shield is good and popular. The influence of vertical mucking by gantry crane on construction efficiency of doubleshield TBM is analyzed. The vertical hoisting methods of material in related projects are studied. The differences between gantry crane and vertical belt conveyor are analyzed in terms of technology, economy and construction schedule. The vertical belt conveyor used in doubleshield TBM and open TBM has many advantages, i.e. high transportation capacity, low failure rate and low cost; and it is worth popularizing.

Key words: vertical belt conveyor, TBM, Metro, mucking