| [1] |
LU Chen, ZHANG Shuai, LIU Yanlong, LI Jieyong, LAI Yong, NIE Jianxing, LU Chunxue.
Severe Deformation Mechanism of Surrounding Rock in Deep Grade Ⅵ Water-Rich Soft Rock Tunnels and Analysis of Double-Layer Primary Support Construction Process: A Case Study of Shanyang Tunnel on Dali-Ruili Railway
[J]. Tunnel Construction, 2026, 46(S1): 153-163.
|
| [2] |
GUO Xinxin, WANG Wanting, WANG Zhijiao, WANG Rui, YU Jiawu, WANG Bo.
Characteristics and Effect of Active Support for Large Deformation Tunnels in Soft Rock
[J]. Tunnel Construction, 2026, 46(S1): 205-216.
|
| [3] |
ZHOU Zehua, XU Youliang, JIN Baocheng, CHU Maocheng, ZHAO Xiaoyong, LU Xing’an.
Risk Identification of TBM Traversing Soft Rock Deformation Sections Based on Attention Convolutional Neural Network-Long Short-Term Memory Model
[J]. Tunnel Construction, 2026, 46(S1): 236-248.
|
| [4] |
YU Li, GUO Xiaohan, WANG Mingnian, LIU Yuan, LI Junqi.
Design of Evacuation and Rescue in Underwater Railway Shield Tunnels Based on Evacuation Psychology and operational safety
[J]. Tunnel Construction, 2026, 46(S1): 397-405.
|
| [5] |
LIU Qingzheng YANG Yandong, LU Gaoming, YAN Renfu, ZHANG Yongming, ZHU Xiaoliang, LI Enlei, LIU Wenshuai, WANG Junli, LIU Qiang, YAO Xiaomin, ZHAI Chaojie.
Optimization of Advance Pipe Roof Support Parameters for TBM Tunnels Based on Response Surface Methodology and Genetic Algorithms
[J]. Tunnel Construction, 2026, 46(S1): 443-455.
|
| [6] |
ZHU Bitang, SUN Junyu, LIU Yinfang, GUO Jian.
Uplift Analysis of Shield Tunneling and Treatment Technology of Pilot-Hole Rock Breaking in Composite Strata of Gravel Soil and Argillaceous Rock
[J]. Tunnel Construction, 2026, 46(S1): 467-476.
|
| [7] |
PENG Chunlin, YU Zegang, XU Dehuai, LIU Liang.
Spatiotemporal Evolution Patterns and Hierarchical Control Technologies for Large Deformations in Extremely Soft Rock Tunnels: A Case Study of Adit #12-1 in Yangtze River-to-Hanjiang River Water Diversion Project
[J]. Tunnel Construction, 2026, 46(S1): 495-505.
|
| [8] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [9] |
LI Xu, DUO Shengjun, REN Chenning, WANG Huiwu, HUANG Pengli, ZHOU Mingliang.
Line Fitting for Emergency Repair of Tunnels Crossing Active Faults After Seismic Displacement Based on Objective Optimization Using Nondominated Sorting Genetic Algorithm Ⅱ
[J]. Tunnel Construction, 2026, 46(9): 2001-2010.
|
| [10] |
LIAN Jie, YANG Jixiang, TIAN Siming, XING Peigang, CHEN Xiwu, GUO Quan, SHI Zhengying.
Automated Recognition and Management System for Railway Tunnel-Construction Processes
[J]. Tunnel Construction, 2026, 46(6): 1208-1219.
|
| [11] |
ZHANG Tian, FU Bingxian, GAO Yaming, NIU Yabin, ZHANG Lixia.
Prefabricated Composite Lining Structure for Reinforcing Railway Tunnel Linings and Its Construction Technology
[J]. Tunnel Construction, 2026, 46(5): 1121-1132.
|
| [12] |
TIAN Siming, ZHANG Yiteng, LI Shucai, LIU Dagang, LI Xu.
Construction and Intelligent Design of a High-Performance Active Support System for Railway Tunnels
[J]. Tunnel Construction, 2026, 46(4): 790-803.
|
| [13] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [14] |
GUO Xinxin, QIN Yao, DUAN Haipeng, WANG Zhijiao, YU Jiawu, WANG Bo.
Design and Application of Small-Aperture Anchor Cable Drilling Vehicle for Soft-Rock Tunnels
[J]. Tunnel Construction, 2026, 46(4): 869-876.
|
| [15] |
ZHAO Yong, TIAN Siming, GONG Jiangfeng, CAO Yong.
Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period
[J]. Tunnel Construction, 2026, 46(4): 877-892.
|