| [1] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [2] |
XU Huaguo.
Experimental Study on Shield Cutting Prestressed Reinforced Concrete Pipe Piles
[J]. Tunnel Construction, 2025, 45(9): 1782-1790.
|
| [3] |
ZHAO Hongbo, LIU Guoqing, ZHANG Changliang, ZHONG Huihong, SONG Shenyou, FAN Ziwu, PENG Yingjun, JIN Wenliang.
Application of Neutron Scattering Method for Identifying Voids at Steel Shell-Concrete Interfaces
[J]. Tunnel Construction, 2025, 45(12): 2266-2274.
|
| [4] |
DING Wanqin, ZHOU Yunxin, XU Motao, WANG Jin, LI Tao, LYU Yanyun, PANG Bo.
Application Benefit
Analysis of Digital Twin Technology in
Tunnel Construction Based on DEMATEL
and System Dynamics
[J]. Tunnel Construction, 2024, 44(S1): 197-203.
|
| [5] |
.
Health Monitoring and
Safety Evaluation of Underwater Shield Tunnels Using Fiber Bragg Grating Sensors
[J]. Tunnel Construction, 2024, 44(S1): 485-496.
|
| [6] |
LI Shucai, WANG Xin, GUO Weidong, TIAN Zhenyan, SHI Shaoshuai.
An Advance Geological Detection Technology of Seismic
Wave While Drilling in Mechanized Tunnel Construction by
Drilling and Blasting Method
[J]. Tunnel Construction, 2024, 44(4): 617-632.
|
| [7] |
GUO Yawei, JIN Wenliang, SONG Shenyou, FU Baiyong.
Impact of Concrete Void Repair on Mechanical
Performance of
Angle Steel Connectors
[J]. Tunnel Construction, 2024, 44(3): 526-534.
|
| [8] |
LI Zhijun, YU Jingbo, WANG Jingang, LIU Weizheng, CHEN Qiao, LI Zeng.
Mechanized Matching and Fast Construction Technology
for Inclined Shafts in HighAltitude Railway Tunnels
[J]. Tunnel Construction, 2024, 44(3): 576-585.
|
| [9] |
WU Mengjun, WU Qingliang, SONG Shenyou, CAO Peng.
Fire Resistance Limit Standard and Fire Protection
Technology of Steel Shell Immersed Tunnel: A Case Study of ShenzhenZhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2024, 44(2): 257-265.
|
| [10] |
WANG Zhijian, TONG Jianjun.
Overview and Prospect of Researches on Intelligent Engineering Technologies for Tunnels Constructed by Drilling-and-Blasting Method
[J]. Tunnel Construction, 2023, 43(4): 529-548.
|
| [11] |
GUO Weishe, HONG Kairong, GAO Pan, LI Fengyuan, , LI Shu′ao, , ZHAO Xu.
Status Quo and Prospects of Tunnel Intelligent Construction in China
[J]. Tunnel Construction, 2023, 43(4): 549-562.
|
| [12] |
SHEN Yanjun, LYU You, LI Shuguang, ZHANG Jinyuan, MA Wen, ZHANG Lei, XU Zhenhao, HUANG Yong.
Research Progress of Tunnel Surrounding Rock
Classification Method and Application Trend of
"Artificial Intelligence+"
[J]. Tunnel Construction, 2023, 43(4): 563-582.
|
| [13] |
FENG Xiandao, WANG Cong, SUN Xiaowei, ZENG Bocun.
Design and Application of Secondary Cofferdam
Structure at Onshore Final Joint
of Immersed Tunnel: a Case Study of Yuliangzhou Section
[J]. Tunnel Construction, 2023, 43(4): 665-673.
|
| [14] |
XIAO Mingqing, XU Chen, XIE Biting, CHEN Wenpeng, WANG Kejin.
Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method
[J]. Tunnel Construction, 2023, 43(3): 369-382.
|
| [15] |
SU Zongxian, WU Xudong, WU Qilin, CHEN Yue, ZHANG Changliang, YANG Cixiang.
Stress Checking Calculation and Accuracy Control
Requirement of Steel Shell Secondary Sitting onto Dock
Piers for ShenzhenZhongshan Link
Immersed Tunnel Tube
[J]. Tunnel Construction, 2022, 42(S2): 273-279.
|