[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
ZHANG Li, SU Rui, HE Chuan, FENG Kun, FANG Ruoquan, XU Peikai.
Fullscale Experimental Study on Bending
Performance of Segmental Joints of Large
Crosssection Shield Tunnel under Pure Compressive Bending Condition
[J]. Tunnel Construction, 2020, 40(7): 997-1003.
|
[3] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[4] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[5] |
ZHANG Yazhou.
Numerical Simulation on Waterproof Capacity of Shield Tunnel
Joints Considering Working State of Sealing Gasket Surface
[J]. Tunnel Construction, 2020, 40(6): 813-820.
|
[6] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|
[7] |
JIN Yuelang, DING Wenqi, XIAO Mingqing, SUN Wenhao, WU Weifeng, YE Meixi, TU Xinbin.
Experimental Research on Sealing Behavior of Segmental Joints of
Sutong GIL Utility Tunnel under Ultra-high Water Pressure
[J]. Tunnel Construction, 2020, 40(4): 538-544.
|
[8] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|
[9] |
FANG Zhongyu.
Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou
[J]. Tunnel Construction, 2020, 40(4): 586-590.
|
[10] |
ZHANG Wenjun, DING Chao, ZHANG Chengping, JIANG Kun.
Influence of Different Dislocation Amount on Composite Sealing Gasket and Long-term Waterproofing Performance Prediction
[J]. Tunnel Construction, 2020, 40(3): 337-345.
|
[11] |
QIN Jiajia.
Study on Parameters Control of Shield Tunneling
in Composite Strata in Hefei Area
[J]. Tunnel Construction, 2020, 40(3): 435-443.
|
[12] |
王百泉, 彭涛, 尚伟, 谢韬.
盾构管片钢筋笼平面网片自动成型模块设计与应用
[J]. Tunnel Construction, 2020, 40(3): 444-451.
|
[13] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[14] |
闫军涛, 胡潇, 刘波.
Stability of Shield Tunnel Excavation Face in Upper soft and Lowerhard Composite Strata
[J]. Tunnel Construction, 2020, 40(2): 223-230.
|
[15] |
ZHANG Wenjun, DING Chao, ZHANG Gaole, WANG Yi, SHANGGUAN Dandan, JIANG Kun.
Type Selection and Design of Composite Sealing Gasket for Segment Joints of Shield Tunnel
[J]. Tunnel Construction, 2020, 40(2): 246-255.
|