Tunnel Construction ›› 2018, Vol. 38 ›› Issue (11): 1846-1852.DOI: 10.3973/j.issn.2096-4498.2018.11.013
Previous Articles Next Articles
LI Zhi
Received:
Revised:
Online:
Published:
Abstract:
Metro reconstruction is different from the construction of new line, which should guarantee the operation of metro. In order to study the solutions to the common problems encountered during reconstruction, the civil engineering and electromechanical problems encountered in the design of cooling tower, entrance and exit, and wind pavilion of Jihuayuan Station on GuangzhouFoshan Line are analyzed and researched; and the solutions are put forward. Meanwhile, the construction difficulties and key points as well as the operation management are analyzed. The results show that: (1)Nonstandardized design can be adopted in the reconstruction projects with limited surrounding conditions. (2)The parameters of nonstandardized design must meet the requirements of metro design before the reconstruction of the existing metro affiliated project. (3)According to the change of surrounding environment, the design and construction scheme must be implemented dynamically based on the opinions from experts, so as to make the reconstruction more humanized and economical.
Key words: metro, reconstruction of affiliated structure, cooling tower, entrance/exit, wind pavilion, civil engineering, electromechanical engineering
CLC Number:
U 452.2
LI Zhi. Analysis and Suggestions on Common Problems in Metro Affiliated Reconstruction Projects: a Case Study of Jihuayuan Station on GuangzhouFoshan Line[J]. Tunnel Construction, 2018, 38(11): 1846-1852.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.11.013
http://www.suidaojs.com/EN/Y2018/V38/I11/1846
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network