| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
FENG Tugen, YUE Chenlong, ZHANG Jian, HU Jinjian, XUE Xinkai, ZHENG Bin.
Performance Improvement of Shield Tunneling by Integrating Machine Learning and Multi-Objective Optimization
[J]. Tunnel Construction, 2026, 46(S1): 67-77.
|
| [3] |
JIN Ming, WANG Shouqiang, YAO Yinbin, DAI Peng, XIAO Liang.
Multi-Objective Optimization of Shield Disc Cutter Layout Based on an Improved Conical Shield Model
[J]. Tunnel Construction, 2026, 46(S1): 123-133.
|
| [4] |
ZHOU Zehua, XU Youliang, JIN Baocheng, CHU Maocheng, ZHAO Xiaoyong, LU Xing’an.
Risk Identification of TBM Traversing Soft Rock Deformation Sections Based on Attention Convolutional Neural Network-Long Short-Term Memory Model
[J]. Tunnel Construction, 2026, 46(S1): 236-248.
|
| [5] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [6] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [7] |
LI Qingmin, WANG Huawei, ZHAO Zhendong, LIU Sijin, YANG Chengxi, SHI Shuo.
Fault Diagnosis of TBM Electric Drive Systems Based on an Adaptive Sparse Fusion Network
[J]. Tunnel Construction, 2026, 46(9): 1825-1836.
|
| [8] |
CHEN Shaolin, XIAO Jing, XU Chao, ZHENG Jiajia, XU Huaguo.
Experimental Study on Rock Breaking by Triple-Disc Cutters With Different Cutter Profiles
[J]. Tunnel Construction, 2026, 46(8): 1640-1649.
|
| [9] |
LIU Binyuan, LUO Yanbin, TAN Chang, YANG Zhenxing, LYU Qianqian, CHEN Zhigang, LIU Weiwei.
Research and Application of a Real-Time Intelligent Early Warning Model for TBM Jamming Risk Based on Transformer Multi-Task Learning
[J]. Tunnel Construction, 2026, 46(8): 1729-1739.
|
| [10] |
WANG Jiannan, WANG Chunhua, REN Fuqiang, LI Qingsong, LIU Huaiqian, MA Qing, LIU Hao, SONG Xin, WANG Jie, LIN Yichao.
Seepage Pressure and Deformation of Surrounding Rock in Double-Shield TBM Tunnels in Water-Rich Fractured Ground: A Fluid-Solid Coupling Analysis
[J]. Tunnel Construction, 2026, 46(6): 1244-1253.
|
| [11] |
HAN Jialin, LIU Xue, WANG Xianjun, XIE Zheng.
Global Typical Case Statistics and Development Analysis of Full-Face Tunnel Boring Machines
[J]. Tunnel Construction, 2026, 46(6): 1359-1382.
|
| [12] |
WANG Yi, ZHENG Wenbao, LUO Gang, LIU Jianping.
Multi-Objective Optimization of a Large-Diameter Shield Cutterhead System and Tunneling Parameters in Complex Strata
[J]. Tunnel Construction, 2026, 46(5): 1109-1120.
|
| [13] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [14] |
HAO Sihaowensong, LI Shuchen, LI Xuewei, LIU Richeng, YIN Weifang, XU Kechun.
Experimental Simulation of Electrochemical Synergistic De-adhesion for Mitigating Shield Cutterhead Clogging in Clayey Strata
[J]. Tunnel Construction, 2026, 46(3): 586-598.
|
| [15] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|