| [1] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [2] |
LIANG Ganbo, YANG Baofeng, ZHU Xin.
Design and Practice of
Super-Large Span Tunnel for Shenzhen-Shantou Western Expressway Extension
Project
[J]. Tunnel Construction, 2024, 44(S1): 301-310.
|
| [3] |
LIU Hanlong, JIANG Jiaqi, LIU Zhicheng, ZHANG Wengang, SUN Weixin, YANG Wenyu, LIU Maoyi, WU Daifeng, CHU Liang, ZHANG Tao.
Review of Design and Calculation Methods for Minimum Overburden Thickness of Shield Tunnels in Water-Rich Environment
[J]. Tunnel Construction, 2024, 44(6): 1127-1144.
|
| [4] |
XIAO Mingqing, XU Chen, CUI Lan, SHENG Qian, CHEN Jian, XIE Biting, WU Peng.
Experimental Study of Bearing Capacity of Shotcrete
Lining Based on Total Safety Factor Method
[J]. Tunnel Construction, 2024, 44(3): 464-474.
|
| [5] |
HUO Jianxun, ZHAO Siguang, LIN Chuannian, WANG Mingnian.
Comparison of Disaster
Prevention, Evacuation, and Rescue Design Technology Systems in Railway Tunnels: China Versus Other Countries
[J]. Tunnel Construction, 2024, 44(12): 2442-2450.
|
| [6] |
WANG Jie, ZHAO Bingxin, JIANG Xuepeng.
Design Method for Underground Space Loop Ventilation and
Smoke Exhaust Based on Sections
[J]. Tunnel Construction, 2024, 44(1): 155-162.
|
| [7] |
KONG Yueyue, WAN Qiwei, DING Haibin, ZHOU Yuelong, HUANG Zhanjun, XU Changjie.
Optimal Design of DoubleBraced
Supporting Structure in Asymmetric Excavation
[J]. Tunnel Construction, 2023, 43(S1): 356-364.
|
| [8] |
GUO Lei.
Three-Dimensional Automatic Design Method
for Tunnel Portal Engineering
[J]. Tunnel Construction, 2023, 43(3): 451-459.
|
| [9] |
JIANG Changwei, CHEN Ziquan, WANG Bo, LI Tiansheng, ZHOU Zihan, BAO Yeming.
Comparative Analysis of Results of Various Methods to
Determine Reasonable Support Timings of DeepBuried
Tunnels with High Ground Stress
[J]. Tunnel Construction, 2023, 43(1): 119-130.
|
| [10] |
ZHANG Zaichen, LIN Congmou, LI Jiasheng, DONG Yi, SHEN Yawen.
Development Status and Prospect of Highway Tunnel
Rehabilitation and Expansion in China
[J]. Tunnel Construction, 2022, 42(4): 570-585.
|
| [11] |
YANG Xiuren.
Design Technology and Method of OpenCut Prefabricated
Underground Structures of Urban Rail Transit
[J]. Tunnel Construction, 2022, 42(3): 355-362.
|
| [12] |
XIAO Mingqing, FENG Kun, YANG Renjie, XIE Jun, GOU Chao.
Comparative Study on Applicability of Normal Section
Design Method
for Steel FiberReinforced Concrete Segment
[J]. Tunnel Construction, 2021, 41(9): 1530-1537.
|
| [13] |
QING Weichen, ZHU Yong, ZHANG Huijian.
Research on Mechanical Characteristics of Anchor Bolts
of Shallow buried Four Track
Railway Station Tunnel
[J]. Tunnel Construction, 2021, 41(5): 749-757.
|
| [14] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
| [15] |
LIU Xian, YANG Zhenhua.
Study on Spatial Distribution Law of Longitudinal
Pressure between Launching and Reaching Sections of
Shield Tunnel
[J]. Tunnel Construction, 2020, 40(11): 1552-1557.
|